Building Permits in ZIP 10018
Manhattan, NY — 668 permits filed recently
668 permits
Facade repairs as per plans filed. no change in use or egress under this application.
Renovation of apt 4e filed in conjunction with dob now pl. no change to use, occupancy or egress.
Install 8' ht construction fence aligned with property and work in-conjunction with alt2#m01355776. no change of use, egress, or occupancy under this application.
Suspended scaffold outrigger system for exterior facade restoration work at 135 west 36 street, manhattan, ny 10018
Facade repairs, scaffold inspections, 3 men letter
Modifications to the existing HVAC System on the 10th Floor as per plans (Hines - ADA Restrooms.) No change to use, egress or occupancy.
Installation of 335' lf heavy duty sidewalk shed as per plans rated for 300 psf & 600 psf debris and material storage. no change to egress, use, or occupancy.
Use of temporary platform/material hoist as per plans filed herewith.
Propose installation of (2) air-cooled condensing units. No change to use, egress or occupancy.
Installation of 335' lf heavy duty sidewalk shed as per plans rated for 300 psf & 600 psf debris and material storage. no change to egress, use, or occupancy.
Facade repairs, scaffold inspections, 3 men letter
Modifications to the existing HVAC System on the 10th Floor as per plans (Hines - ADA Restrooms.) No change to use, egress or occupancy.
Install 8' ht construction fence aligned with property and work in-conjunction with alt2#m01355776. no change of use, egress, or occupancy under this application.
Propose installation of (2) air-cooled condensing units. No change to use, egress or occupancy.
Suspended scaffold outrigger system for exterior facade restoration work at 135 west 36 street, manhattan, ny 10018
Use of temporary platform/material hoist as per plans filed herewith.
Structural modifications to floor 1 as per plans filed herewith. No change in use, egress or occupancy.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Installation of temporary suspended scaffolds per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this application.
Seyfarth Shaw-- Modifications to existing sprinkler system on parts of the 31st, 32nd, and 33rd floors.