Building Permits in ZIP 10018
Manhattan, NY — 676 permits filed recently
676 permits
Filed herewith for interior removal of non-load bearing walls on the 6th floor to create white box as per plan, no change to use egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Modifications to the existing HVAC System and relocation of ductwork on the 7th Floor as per plans (Hines - Demising Wall.) No change to use, egress or occupancy.
Minor interior demolition: Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 7th Floor as per plans (Hines - Demising Wall.) No change to use, egress or occupancy...
Structural work on the 12th floor and part of the 13th floor (Culture Fly) as indicated on drawings.
Addition and modification to existing sprinkler system on 26 and 27th floors as shown herewith. no changes to egress,occupancy or use.
interior plumbing work on 26th and 27th floors as shown herewith.
Minor renovation of existing office space at 11th floor. no change in use, egress or occupancy.
interior plumbing work on 26th and 27th floors as shown herewith.
Modifications to the existing Sprinkler System: Remove (18) sprinkler heads and Install (15) new sprinkler heads and associated Sprinkler Piping on the 7th Floor as per plans (Hines - Demising Wall.)...
Minor renovation of existing office space at 11th floor. no change in use, egress or occupancy.
Filed herewith for interior removal of non-load bearing walls on the 6th floor to create white box as per plan, no change to use egress or occupancy.
Structural work on the 12th floor and part of the 13th floor (Culture Fly) as indicated on drawings.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Minor interior demolition: Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 7th Floor as per plans (Hines - Demising Wall.) No change to use, egress or occupancy...
Modifications to the existing HVAC System and relocation of ductwork on the 7th Floor as per plans (Hines - Demising Wall.) No change to use, egress or occupancy.
Addition and modification to existing sprinkler system on 26 and 27th floors as shown herewith. no changes to egress,occupancy or use.
Propose plumbing work and modification of existing sprinkler system. No change in use, egress or occupancy.
Installation and use of temporary loading platform. no change in use, egress or occupancy.
Conversion of elevator shaft to debris chute as per plans filed herewith. This application is filed in conjunction with DM M00974121-I1.