Building Permits in ZIP 10018
Manhattan, NY — 676 permits filed recently
676 permits
Installation of partitions and finishes, HVAC, installations and modifications, plumbing installations, and modifications, sprinkler and standpipe, installations, and modifications to structural, etc.
General construction taking place on cellar & 1st fl as per plans filed herewith. no change in use, egress, or occupancy.
Removal of old air conditioning units and replacement with new unit in kind.
Intallation of new 6 fire service, new dcda, and new 3 rpx.
Installation of partitions and finishes, HVAC, installations and modifications, plumbing installations, and modifications, sprinkler and standpipe, installations, and modifications to structural, etc.
General construction taking place on cellar & 1st fl as per plans filed herewith. no change in use, egress, or occupancy.
Installation of new plumbing fixtures on the 21st floor (High Life) as per plans filed herewith. No change to egress, use or occupancy.
Propose to install non-advertising sign. No change in use, egress, or occupancy.
Installation of interior non-loadbearing partitions and floor buildout as shown on the drawings filed herewith. No change in use, egress, or occupancy.
Installation of 355 sprinkler heads (concealed and upright) on the 21st floor (HighLife) as per plans filed herewith. No change to egress, use or occupancy.
Construction work on the 12th and part of the 13th floor (Culture Fly) as indicated on drawings.
Installation of suspended scaffold for facade work or inspection
Partial renovation of the 25th floor and 24th floor. New partitions, doors and fixtures. No change to use, egress or occupancy.
Installation of interior non-loadbearing partitions and floor buildout as shown on the drawings filed herewith. No change in use, egress, or occupancy.
Partial renovation of the 25th floor and 24th floor. New partitions, doors and fixtures. No change to use, egress or occupancy.
Installation of 355 sprinkler heads (concealed and upright) on the 21st floor (HighLife) as per plans filed herewith. No change to egress, use or occupancy.
Installation of new plumbing fixtures on the 21st floor (High Life) as per plans filed herewith. No change to egress, use or occupancy.
Construction work on the 12th and part of the 13th floor (Culture Fly) as indicated on drawings.
Propose to install non-advertising sign. No change in use, egress, or occupancy.
Installation of suspended scaffold for facade work or inspection