Building Permits in ZIP 10017
Manhattan, NY — 1,032 permits filed recently
1,032 permits
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 24 through 26. Construction costs and filing fees included in full-floor Mechanical job # M01293926-S1. No change in use, e...
Propose to install new non-illuminated metal letters on aluminum raceway for existing commercial space. no change to use, egress or occupancy.
Filing herewith, Plumbing work to provide sanitary, vent, and storm piping within the foundation with capped outlets for future plumbing fixtures and connections. This is in conjunction with NB M00615...
Propose to install new non-illuminated metal letters on aluminum raceway for existing commercial space. no change to use, egress or occupancy.
FILING FOR PLUMBING WORK ASSOCIATED WITH INTERIOR RENOVATION OF 28th FLOOR GALLET DRYER BERKEY OFFICE AS PER PLANS SUBMITTED HEREWITH.
Filing herewith, Plumbing work to provide sanitary, vent, and storm piping within the foundation with capped outlets for future plumbing fixtures and connections. This is in conjunction with NB M00615...
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 24 through 26. Construction costs and filing fees included in full-floor Mechanical job # M01293926-S1. No change in use, e...
Removal and installation of pluming fixtures and related piping as shown on drawigs. no change to use, egress or occupancy.
Plumbing work at apt.#23D in conjunction with general construction job # M011345110-I1.
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 39 through 41. Construction costs and filing fees included in full-floor Mechanical job # M01293994-S1. No change in use, e...
Mechanical changes as indicated on plans; including changes to existing louver and installation of AC Supplemental Unit.
Early-phase Mechanical modifications to fan powered boxes and fans on Floor 19. Construction costs and filing fees included in full-floor Mechanical job #M01293917-S1. No change in use, egress, or occ...
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 30 through 33. Construction costs and filing fees included in full-floor Mechanical job # M01293952-S1. No change in use, e...
Inspection and repair of facade where required in order to maintain building.
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 20 through 23. Construction costs and filing fees included in full-floor Mechanical job # M01293923-S1. No change in use, e...
8th and 9th Cycle FISP repairs. Resolve ECB violations 35651397Y and 35651398X and DOB violation 021822FISPHAZ910019. No change to use, egress, or occupancy.
Interior demo &n reno of non-load bearing partitions, walls, doors, frames, ceiling & finishes as indicated on plans.
Office interior renovation at 6th floor. interior renovation including installation of interior non-loading partitions, ceiling tiles, millwork, cabinetry, furniture, and finishes. there is no change...
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 09 through 11. Construction costs and filing fees included in full-floor Mechanical job #M01294935-S1. No change in use, eg...
Filing herewith mechanical work as per plans.