Building Permits in ZIP 10017
Manhattan, NY — 1,032 permits filed recently
1,032 permits
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the Cellar & Ground Floors as per plans (CBRE Retail Space.) No change to use, e...
Plumbing work related to the installation of new cogeneration unit. no change in egress or occupancy.
Erect, maintain & dismantle of scaffold for facade repairs per drawings attached herewith
Sprinkler modifications taking place on the 1st floor (lobby) as per plans filed herewith. No change in use, egress or occupancy.
Modifications to the existing HVAC System; Installation of new supplemental unit and ductwork on the Cellar & 1st Floor as per plans (Retail Space - Renovations.) No change to use, egress or occupancy...
Equipment use: dual 7000 # capacity personnel hoist during bldg alteration, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elev...
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 07 through 08. Construction costs and filing fees included in full-floor Mechanical job #M01293902-S1. No change in use, eg...
INSTALLATION OF 300 psf SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE INUSE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 03 through 06. Construction costs and filing fees included in full-floor Mechanical job #M01293886-S1. No change in use, eg...
Modification of Cellar, 1st, Mezzanine, 3rd, 4th, 7th, 8th, 11th, 12th, 13th Mezzanine, 14th, 15th, roof per plans filed
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 3rd floor (2c/3m) as per plans filed herewith. no change in use, egress, or occupancy.
Hereby filing to remove and install hot water heaters as shown on plans filed herewith. No change to use, occupancy or egress.
Interior alterations to include non-load bearing demo, partition and finishes work. no change to use, occupancy or egress
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 34 through 38. Construction costs and filing fees included in full-floor Mechanical job # M01293987-S1. No change in use, e...
Interior alterations of existing 37 and 38th floor commercial office space. no change to use, occupancy or egress
Structural Modifications associated with escalator demo/rebuild, slab infill and new stair opening, new footings, new partial deck on the Cellar & 1st Floor as per plans (Retail Space.) No change to u...
Erect, maintain & dismantle of scaffold for facade repairs per drawings attached herewith.
Proposed installation of 1 illuminated, double-faced, non flashing, accessory business sign. wording logo iqp park 24 hrs
Removal and installation of pluming fixtures and related piping as shown on drawigs. no change to use, egress or occupancy.
FILING FOR PLUMBING WORK ASSOCIATED WITH INTERIOR RENOVATION OF 28th FLOOR GALLET DRYER BERKEY OFFICE AS PER PLANS SUBMITTED HEREWITH.