Mechanical changes as indicated on plans; including changes to existing louver and installation of AC Supplemental Unit.
Filing herewith mechanical work as per plans.
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 20 through 23. Construction costs and filing fees included in full-floor Mechanical job # M01293923-S1. No change in use, e...
Early-phase Mechanical modifications to fan powered boxes and fans on Floor 19. Construction costs and filing fees included in full-floor Mechanical job #M01293917-S1. No change in use, egress, or occ...
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 09 through 11. Construction costs and filing fees included in full-floor Mechanical job #M01294935-S1. No change in use, eg...
Inspection and repair of facade where required in order to maintain building.
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 39 through 41. Construction costs and filing fees included in full-floor Mechanical job # M01293994-S1. No change in use, e...
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 30 through 33. Construction costs and filing fees included in full-floor Mechanical job # M01293952-S1. No change in use, e...
Office interior renovation at 6th floor. interior renovation including installation of interior non-loading partitions, ceiling tiles, millwork, cabinetry, furniture, and finishes. there is no change...
8th and 9th Cycle FISP repairs. Resolve ECB violations 35651397Y and 35651398X and DOB violation 021822FISPHAZ910019. No change to use, egress, or occupancy.
Plumbing work at apt.#23D in conjunction with general construction job # M011345110-I1.
Install new awning with canvas cover at storefront reading the best sichuan as per plan. no change in use, egress, and occupancy.
Selective demolition of interior non-bearing partitions, related finishes, removal and reinstallation of column fireproofing and tenant layouts (Early Demo Package 1) as per plans. No change to use, e...
Structural modifications (Early Demo- Package 2) as per plans. No change to use, egress or occupancy.
HVAC removals (Early Demo- Package 1) as per plans. No change to use, egress or occupancy.
Installation of 300psf sidewalk shed as per plans, sidewalk shed shall comply with chapter # 33 of the code 2014, no cganges in use egress or occupancy under this application.
Filing for interior renovation of 28th floor gallet dryer berkey office as per plans submitted herewith. no change to use, egress, or occupancy.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Slab infill to existing floor opening (Early Demo Package 2) as per plans. No change to the existing building envelope, use, egress or occupancy.
Install new awning with canvas cover at storefront reading the best sichuan as per plan. no change in use, egress, and occupancy.