Building Permits in ZIP 10014
Manhattan, NY — 1,109 permits filed recently
1,109 permits
Structural repairs to include joist replacement, joist sistering, repointing , reframing and painting of the fire escape. No change to use, bulk or egress.
Structural repairs scope of work for existing roof. no change to use, egress or occupancy.
Installation of temporary plywood fence as per plan. no change in use, egress, or occupancy. the plywood fence attached to the sidewalk shed front elevation and rear elevation. the fence free standing...
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Propose plumbing work in conjunction with arch. design #m01082434-i1. no change in use, egress, or occupancy.
This alteration is being filed for interior demolition of the existing cellar, 1st & 2nd floors. Work includes demo of non structural partitions & doors.
Renovation of apartment including non-structural removals, new partitions and finishes, upgrade to kitchen and bathroom. No change to use, egress or occupancy.
Install (1) DW, (1) HWH, (1) BFP, (1) Expansion Tank, (1) Grease Interceptor, (1) IM, (1) Lavatory, (1) WC, (4) FD, (1) FS, (3) sinks and associated CW/sanitary piping on the 1st Floor as per plans (T...
Install (1) DW, (1) HWH, (1) BFP, (1) Expansion Tank, (1) Grease Interceptor, (1) IM, (1) Lavatory, (1) WC, (4) FD, (1) FS, (3) sinks and associated CW/sanitary piping on the 1st Floor as per plans (T...
Renovation of apartment including non-structural removals, new partitions and finishes, upgrade to kitchen and bathroom. No change to use, egress or occupancy.
This alteration is being filed for interior demolition of the existing cellar, 1st & 2nd floors. Work includes demo of non structural partitions & doors.
Installation of 300 psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Bathroom and closet renovation of apt. #1s. no change of use, egress or occupancy.
Filing herewith plumbing work in conjunction with building renovations as per plans.
Alterations/modification to existing Mechanical Systems. No change in use, egress, or occupancy
Replace and relocate plumbing fixtures according to drawings. No change to use or egress
Foundations for future electric light pole installation.
Filing herewith new fire sprinkler protection system as required to accomodate the proposed architectural changes as per plans.
Modification to existing at&t telecommunications site. relocate (2) rrh units and remove (2) cabinet in existing equipment room in cellar. all in conformance with tppn 5/98. no change in use, egress,...
Installation of a temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.