Temporary platform to provide access from the street to the sidewalk over the existing sidewalk vault during construction. No change to use, egress, or occupancy.
Facade repairs, scaffold inspections, 3 men letter
PROPOSE INTERIOR RENOVATION WORK AT CEL., BAS., 1st THRU 3rd FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Install new cooking equipment and plumbing fixtures in existing pizzeria (use group 6).
Modifications to existing HVAC System: Remove ductwork, diffusers, AC units and associated equipment on the 7th Floor and Reinstall ductwork on the 6th Floor in relation to slab infill as per plans (D...
Facade repairs as per plans. no change to use, egress or occupancy.
Minor interior partition removals & construction in conjunction with renovation of apartment #2c. renovate bathrooms + kitchen. perform related plumbing work under separate dob now application. no cha...
Application filed for interior renovation of multi-family walk-up building. No change in use, occupancy or egress.
Modifications to existing HVAC System: Remove ductwork, diffusers, AC units and associated equipment on the 7th Floor and Reinstall ductwork on the 6th Floor in relation to slab infill as per plans (D...
Application filed for interior renovation of multi-family walk-up building. No change in use, occupancy or egress.
PROPOSE INTERIOR RENOVATION WORK AT CEL., BAS., 1st THRU 3rd FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Facade repairs as per plans. no change to use, egress or occupancy.
Install new cooking equipment and plumbing fixtures in existing pizzeria (use group 6).
Minor interior partition removals & construction in conjunction with renovation of apartment #2c. renovate bathrooms + kitchen. perform related plumbing work under separate dob now application. no cha...
Erect a non-illuminated business accessory wall sign installed onto new metal transom. no change in use, egress, or occupancy.
Interior renovation of first floor retail. no change in use, occupancy, or egress.
Use of telehandler for facade panel installation. This application is filed in conjunction with NB M08015986-I1
Filing herewith installation of sprinkler & standpipe system as per plans. application filed in conjunction with new building.
Demolition of rear wall. Provide shoring for demolition of rear wall. Reinforcement of existing framing with sistered members and steel beams. Reinforcement of rear wall with steel moment frame. No ch...
Provide concrete footing for base of moment frame, concrete retaining walls and footings for lowered rear yard and concrete footings and side walls for new front areaway entry and stoop. No change in...