Installation of pipe scaffolding as per plans. pipe scaffold shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of a heavy duty sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Plumbing work as shown on plans filed herewith.
Remove relocate and install new plumbing fixtures in conjunction with the combination of apartments 11b & 11c on the 11th floor . work include the removal of one kitchen . all as per plan .
Installation of temporary engineered enclosure system as per plans. no change in use, egress or occupancy
Facade repairs, scaffold inspections, 3 men letter
Minor interior demolition; Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 7th floor as per plans (Hines - Demo, Whitebox & Stair Infill) No change to...
Interior renovation of unit m6. minor demolition in cellar, first & second floor as per plans. new interior partitions & doors, finishes, plumbing & lighting as per plans. new railings & stair repairs...
Limited removal & replacement of existing millwork & lighting, including installation of new security desk and mail package enclosure.
Temporary platform to provide access from the street to the sidewalk over the existing sidewalk vault during construction. No change to use, egress, or occupancy.
Minor interior partition removals & construction in conjunction with renovation of apartment #2c. renovate bathrooms + kitchen. perform related plumbing work under separate dob now application. no cha...
Modifications to existing HVAC System: Remove ductwork, diffusers, AC units and associated equipment on the 7th Floor and Reinstall ductwork on the 6th Floor in relation to slab infill as per plans (D...
Facade repairs as per plans. no change to use, egress or occupancy.
Application filed for interior renovation of multi-family walk-up building. No change in use, occupancy or egress.
PROPOSE INTERIOR RENOVATION WORK AT CEL., BAS., 1st THRU 3rd FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Install new cooking equipment and plumbing fixtures in existing pizzeria (use group 6).
PROPOSE INTERIOR RENOVATION WORK AT CEL., BAS., 1st THRU 3rd FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Facade repairs as per plans. no change to use, egress or occupancy.
Minor interior partition removals & construction in conjunction with renovation of apartment #2c. renovate bathrooms + kitchen. perform related plumbing work under separate dob now application. no cha...