Building Permits in ZIP 10001
Manhattan, NY — 1,056 permits filed recently
1,056 permits
Facade repairs as per plans; no change to use, egress, or occupancy.
Sprinkler alterations on the 7th floor for proposed interior demolition and whitebox of existing commercial tenant space; related work as per plans.
To install plumbing fixtures for commercial kitchen in conjunction with gc work type m01211133-i1 as per plan filed herewith; to replace all work filed under job m00810048. no change of use, egress or...
Propose to install non-advertising sign. No change in use, egress, or occupancy.
Removal of all walls, floor finishes, ceiling lighting, power, voice data, and millwork on the 24 floor office space as per plans. no change in use, occupancy, or egress
General construction on floors 1-3 as per plans filed herewith. No changes in use, egress or occupancy.
Installation of suspended scaffold for facade work or inspection
Propose to install non-advertising sign. No change in use, egress, or occupancy.
Propose to install non-advertising sign. No change in use, egress, or occupancy.
Install new paint wall and ceiling, new cement flooring. extend existing bar counter to 8'. install (5) display tv.
Install new plumbing fixtures as per plan. there is no change of use, egress, or occupancy filed under this plan
2026 Auto Show @ JJC - Nissan - Install a temporary exhibit within an existing exhibition building scheduled April 3rd-April 12th, 2026. No change of use, egress or occupancy under this application.
Temporary structure for an WNBA event at HY Plaza. Removed at the end of the programing. No changes to existing structures, use or egress.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
FACADE INSPECTION Designated Primary Site supervisor: Jesus Decola
Installation of new gas meter and gas piping as per plans. No change to occupancy, use, or egress.
Provide mechanical work including vrf heating and cooling systems, building ventilation systems. install mechanical exhaust hood work for commercial kitchen of eating and drinking establish. no change...
Installation of suspended scaffold for facade inspection/repair.
Provide mechanical work including vrf heating and cooling systems, building ventilation systems. install mechanical exhaust hood work for commercial kitchen of eating and drinking establish. no change...
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.