Other Permits in Manhattan, New York
11,312 other permits filed recently
11,312 permits
Installation of temporary engineered enclosure system as per plans. no change in use, egress or occupancy
Replace existing air handling unit and associated ductwork and piping in B4 and B3 levels.
Installation of temporary chain link fence as per plans. chain link fence shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
Installation of a ventilation system dedicated for FA UPS closet.
Installation of temporary betamax material hoist per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this application.
Propose to perform demo work. No change in use, egress or occupancy.
Herewith filing for the removal of a single Fire Hose Cabinet (FHC) at the 12th Floor (East Wing), as indicated on the submitted plans. No change in use, egress, or occupancy is proposed.
Demo in apt 2d filed in conjunction with dob now gc and pl. no change to use, occupancy or egress.
Non-illuminated non-advertising accessory entrance canopy - activate. no change of use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary personnel material hoist as per plans. no change in use, egress or occupancy.
Installation of suspended scaffold for facade work or inspection.
Installation of new sidewalk shed and pipe scaffold with material hoist at 115 east 81st street, manhattan as per plans. there will be no change in the use, egress, or occupancy under this application...
Suspended Scaffold for Facade Restoration as Shown on Plans
RETAIL# 2 - Mechanical work for removal and relocating of piping and ducts
Filing DMO means and methods associated with Alt-CO #M01225674-I1. No change to use, egress, or occupancy.
new steel and concrete house pads for new gas fired water heaters and misalliances mechanical equipment.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
provide services related to installation of new underground gas lines between existing building and restorations of supported excavations