Other Permits in Manhattan, New York
11,312 other permits filed recently
11,312 permits
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Facade restoration via suspended scaffolds
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
new steel and concrete house pads for new gas fired water heaters and misalliances mechanical equipment.
provide services related to installation of new underground gas lines between existing building and restorations of supported excavations
provide services related to installation of new underground gas lines between existing building and restorations of supported excavations
provide services related to installation of new underground gas lines between existing building and restorations of supported excavations
Install of temp tent structures for the Annual 2023 MET Costume Institute Benefit Gala. No alt to exist structures. A TPA permit is req. Prod responsible to monitor site safety & implement HWAP. All p...
Tang Temp Egress. Sprinkler work as per plans.
Provide services to support Mechanical equipment removals and new installations
Structural analysis to support new mechanical equipment installations
Structural analysis to support new mechanical equipment installations
installation of pipe scaffolding. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Temporary system scaffold stair tower as per drawings. system scaffold stair tower shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Installation of split systems heat pump and ventilation systems in conjunction with conversion of an existing multi-family residence to a single family residence.
Suspended Scaffold for Facade Restoration as Shown on Plans
Structural related work to support new mechanical equipment installations
installation of new mechanical piping, and all accessories related to the new gas fired hot water heaters. installation of new condensate pumps for existing heating system as per plans.
Installation of temporary personnel material hoist as per plans. no change in use, egress or occupancy.
Filing DMO means and methods associated with Alt-CO #M01225674-I1. No change to use, egress, or occupancy.