HVAC Permits in Manhattan, New York
1,069 hvac permits filed recently
1,069 permits
Modifications to existing HVAC System as per plans filed herewith. No change in use, egress, or occupancy.
Installation of hvac equipment, ductwork, and piping for apartment renovation. no change in use, egress or occupancy.
B Bldg. Econ: Modification of HVAC equipment and ductwork to accommodate alterations for the new economizer as indicated on plans filed herewith. No change to use, egress or occupancy.
LMH CT 187: Modification to HVAC ductwork, piping and equipment to accommodate the CT upgrade in the existing hospital building as per plans filed herewith only. No change to zoning, use, egress or oc...
Modification of existing HVAC system on the 33rd Floor (Moroccanoil Office), including the installation of new units, and associated ducts and piping, as per plans. No change to use, egress, or occupa...
Ahb egen: modification of hvac equipment to accommodate the installation of new emergency generators as per plans.
Feldman Econ: Modification of HVAC Equipment and Ductworks to accommodate installation of a new waterside economizer as indicated on plans filed herewith. No change to use, egress or occupancy.
Modifications to the existing HVAC system on the 6 & 7 Floors as per plans. No change to use, egress or occupancy.
Removal of existing mechanical system. Provide new HVAC system, new gas boiler, hot water for perimeter heating system and domestic water heating; provide exhaust fans for emergency smoke removal of e...
New HVAC system on a portion of the 13 floor (marketed as 14) in conjunction with Alt #M01367407 as per plans filed
Fit goodman ac: modification of hvac equipment and ductwork to accommodate alterations within the existing building as per plans. no change to use, egress or occupancy.
Modifications to the existing HVAC system on the 45th floor as per plans. No change to use, egress or occupancy.
Interior renovation of store (nail shop) at 001. work includes installation of non-bearing partitions, new service area (nail stations/pedicure), and misc. gc & hvac/ventilation work as per the plans...
Feldman Econ: Modification of HVAC Equipment and Ductworks to accommodate installation of a new waterside economizer as indicated on plans filed herewith. No change to use, egress or occupancy.
B Bldg. Econ: Modification of HVAC equipment and ductwork to accommodate alterations for the new economizer as indicated on plans filed herewith. No change to use, egress or occupancy.
Fit goodman ac: modification of hvac equipment and ductwork to accommodate alterations within the existing building as per plans. no change to use, egress or occupancy.
Modification of existing HVAC system on the 33rd Floor (Moroccanoil Office), including the installation of new units, and associated ducts and piping, as per plans. No change to use, egress, or occupa...
Re-install additional gas dryer off existing future tee connection and repair dryer venting in response to violation # 039145853m. file for gas connection to replacement gas boiler in response to viol...
Modifications to the existing HVAC system on the 6 & 7 Floors as per plans. No change to use, egress or occupancy.
LMH CT 187: Modification to HVAC ductwork, piping and equipment to accommodate the CT upgrade in the existing hospital building as per plans filed herewith only. No change to zoning, use, egress or oc...