HVAC Permits in Manhattan, New York
1,069 hvac permits filed recently
1,069 permits
Perform selective removal work, provide new HVAC equip & assoc ductwork, piping, controls, accessories, etc. Protect & reuse existing equipment as shown on plans. Application filed in conjunction with...
Hvac modifications for 9th floor commercial space.
Nycha east river boilers consisting of plumbing work in the cellar as per plans filed herewith. no change to use, egress, or occupancy.
Install replacement boiler/burner unit as per plans. no change to use, occupancy or egress.
Modifications to the existing HVAC system on the 12th floor as per plans. No change to use, egress or occupancy.
Boiler replacement and associated ducts and piping work as per plans filed herewith. no change in use, egress, or occupancy.
Replacement of air conditioning units in apartment apt. 9b, 9th floor residence with minor mechancial work as per plans filed herewith. no change in use,egress or occupancy
Installation of mechanical HVAC system, ventilation duct work. Mechanical scope only.
Modifications to the existing HVAC system on the 8th floor (HITT - Office Buildout) as per plans. No change to use, egress or occupancy
Installation of hvac equipment, ductwork, and piping for apartment renovation. no change in use, egress or occupancy.
Install new HVAC units for Chase Bank.
Modifications to existing HVAC System as per plans filed herewith. No change in use, egress, or occupancy.
Install new HVAC units for Chase Bank.
Hvac modifications for 9th floor commercial space.
Modifications to the existing HVAC system on the 8th floor (HITT - Office Buildout) as per plans. No change to use, egress or occupancy
Install replacement boiler/burner unit as per plans. no change to use, occupancy or egress.
Installation of hvac equipment, ductwork, and piping for apartment renovation. no change in use, egress or occupancy.
Modifications to existing HVAC System as per plans filed herewith. No change in use, egress, or occupancy.
Installation of mechanical HVAC system, ventilation duct work. Mechanical scope only.
Boiler replacement and associated ducts and piping work as per plans filed herewith. no change in use, egress, or occupancy.