HVAC Permits in Brooklyn, New York
737 hvac permits filed recently
737 permits
Perform minor interior partition demolition & construction work inconjunction with existing ug6 eating & drinking establishment renovation. modify layout and replace bathroom. reconfigure & install ne...
Perform minor interior partition demolition & construction work inconjunction with existing ug6 eating & drinking establishment renovation. modify layout and replace bathroom. reconfigure & install ne...
Register two (2) residential boilers in cellar.
JOB FILED HEREWITH FOR NEW BOILER EQUIPMENT IN THE BASEMENT AS PER PLANS, INCLUDING INSTALLATION OF NEW TANKLESS COMBI HEAT/HWH BOILERs. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Perform minor interior partition demolition & construction work inconjunction with existing ug6 eating & drinking establishment renovation. modify layout and replace bathroom. reconfigure & install ne...
Renovation of existing cellar, 1st and 2nd floor with plumbing work: relocate kitchen and bathroom fixtures; new 2-pc restroom, washer,dryer, boilers and hot water heaters in cellar; no change in use,...
Installation of Mechanical HVAC equipment, ductwork, piping, vent and exhausts related to the enlargement.
Installation of Mechanical HVAC equipment, ductwork, piping, vent and exhausts related to the enlargement.
Modification of HVAC system as per plans filed herewith.
Remove (1) oil tank and (1) boiler; Install (2) boiler, (2) H.W.H., (1) sump pump, (1) ejector pump, (1) lavatory and (1) water closet in the Cellar. No change in use, occupancy or egress.
Existing boiler and heating piping removal. installation of new heat pump vrf system and associated piping. no change in use, egress, or occupancy.
Installation of new hvac split unit for apt. 2a of existing four story residential building. no change in occupancy, use, or egress.
installation of a new wet pipe sprinkler system throughout building. install one (1) new boiler, one (1)1 hwh & one (1) new 2 350xl2 Wilkins lead free DCVA with one (1) new 2 combined water main from...
INSTALLATION OF 2 TEMP. BOILERS WITHIN PROPERTY FOR USE DURING NEW BOILER INSTALLATION, IN CONJUNCTION WITH LAA# B01287237-I1. BOTH BOILERS (Temp-1 #40000205559N00011, Temp-2 #40000009281N1111) WILL B...
Modification of HVAC system as per plans filed herewith.
Existing boiler and heating piping removal. installation of new heat pump vrf system and associated piping. no change in use, egress, or occupancy.
INSTALLATION OF 2 TEMP. BOILERS WITHIN PROPERTY FOR USE DURING NEW BOILER INSTALLATION, IN CONJUNCTION WITH LAA# B01287237-I1. BOTH BOILERS (Temp-1 #40000205559N00011, Temp-2 #40000009281N1111) WILL B...
Installation of new hvac split unit for apt. 2a of existing four story residential building. no change in occupancy, use, or egress.
installation of a new wet pipe sprinkler system throughout building. install one (1) new boiler, one (1)1 hwh & one (1) new 2 350xl2 Wilkins lead free DCVA with one (1) new 2 combined water main from...
Remove (1) oil tank and (1) boiler; Install (2) boiler, (2) H.W.H., (1) sump pump, (1) ejector pump, (1) lavatory and (1) water closet in the Cellar. No change in use, occupancy or egress.