HVAC Permits in Brooklyn, New York
737 hvac permits filed recently
737 permits
installation of hvac equipment and exhaust fans
Provide protection for the replacement of existing boilers and air conditioning equipment to comply with Local Law 97. Minor interior work replacing doors and relocate managers office space. No change...
Gas connection to replacement gas boilers and hot water heaters. install domestic hot water storage tanks. aka 129 north 3rd street, brooklyn
Repairs to lower carbon emissions, demolish steam boiler and associated radiators and RIP mechanical equipment, install electric heaters in lieu of steam radiators and equipment for electrical sub-met...
Install three split units hvac system for existing three family house, no change in use, egress, and occupancy.
Modifications to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Mechanical work in conjunction w/ interior reno. Upgrade of heating system; new condensing boilers - heating hot water & domestic hot water. New radiators installed in each Apt; updated piping, equipm...
The purpose of this filing is to provide demolition of interior non-bearing walls and to propose hvac system for existing 1 story building. this filing is in conjunction with application # b01209860-i...
General renovation of 3-family house with replace/relocated/new plumbing fixtures and boiler and h.w.h as per plan. no change in use, egress or occupancy.
NYCHA Boiler Building # 2 Natural Gas piping will be running underground from gas meter room and domestic hot water heater rooms
Installation of new HVAC for a Renovated (1) family house. No change of use, egress or occupancy under this aaplication.
Herewith filing for new installation of hvac system.
The purpose of this filing is to provide demolition of interior non-bearing walls and to propose hvac system for existing 1 story building. this filing is in conjunction with application # b01209860-i...
Installation of new HVAC for a Renovated (1) family house. No change of use, egress or occupancy under this aaplication.
Perform minor interior partition demolition & construction work inconjunction with existing ug6 eating & drinking establishment renovation. modify layout and replace bathroom. reconfigure & install ne...
Renovation of existing cellar, 1st and 2nd floor with plumbing work: relocate kitchen and bathroom fixtures; new 2-pc restroom, washer,dryer, boilers and hot water heaters in cellar; no change in use,...
Register two (2) residential boilers in cellar.
Renovation of exist. residential house with cap/remove/relocate/replace/new boiler, bathroom, kitchen and plumbing fixtures as per plan. no change in use, egress or occupancy.
JOB FILED HEREWITH FOR NEW BOILER EQUIPMENT IN THE BASEMENT AS PER PLANS, INCLUDING INSTALLATION OF NEW TANKLESS COMBI HEAT/HWH BOILERs. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Installation of new HVAC system throughout New residential building