Building Permits in ZIP 10280
Manhattan, NY — 48 permits filed recently
48 permits
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Partial interior renovation of an existing commercial space on the 1st floor. no change to use, egress or occupancy.
Partial interior renovation of an existing commercial space on the 1st floor. no change to use, egress or occupancy.
Reach 7 - the scope includes the relocation of 3 existing 12 watermains as part of the main contract, along w/ the installation of 5 new valves and valve boxes. 1 existing 6 fire hydrant lead will be...
Installation of non-emergency 50kw generator on a new steel platform on the bulkhead. No change in use, egress, or occupancy. Re-filing abandoned job # 121866301.
M276 - Replace roof drains and roof trench drains
M276 - Replace roof drains and roof trench drains
Proposed garage, column repairs as indicated on plans submitted herewith. there is no change in use, egress or occupancy.
Proposed garage, column repairs as indicated on plans submitted herewith. there is no change in use, egress or occupancy.
M276 - Selective interior and exterior repairs. replacement of roof top play area safety surface.
M276 - Selective interior and exterior repairs. replacement of roof top play area safety surface.
Installation of ABOUT 104 L.F of SIDEWLK SHED , at the building , No change of Use or Egress Or Occupancy of the building. the aplication is filed in conjunction with DOBNOW # M00907512
Installation of ABOUT 104 L.F of SIDEWLK SHED , at the building , No change of Use or Egress Or Occupancy of the building. the aplication is filed in conjunction with DOBNOW # M00907512
Filing for Plumbing for EWP4 - relocation of critical utilities (ECS, water) in advance of construction of a flood barrier system for the BPCA North/West Battery Park City Resiliency project. No chang...
Filing for Plumbing for EWP4 - relocation of critical utilities (ECS, water) in advance of construction of a flood barrier system for the BPCA North/West Battery Park City Resiliency project. No chang...
Hvac work for lobby renovation as per the plans filed herewith. no change to use, egress or occupancy.
Interior renovation of partial 1st floor lobbies, corridors, mail rooms and elevator vestibules. Remove/replace non-load bearing partitions, fixtures, and finished as per plans filed herewith. No chan...
Interior renovation of partial 1st floor lobbies, corridors, mail rooms and elevator vestibules. Remove/replace non-load bearing partitions, fixtures, and finished as per plans filed herewith. No chan...
Interior renovation of partial 1st floor lobbies, corridors, mail rooms and elevator vestibules. Remove/replace non-load bearing partitions, fixtures, and finished as per plans filed herewith. No chan...