Building Permits in ZIP 10128
Manhattan, NY — 764 permits filed recently
764 permits
Kitchen and batthrooms renovation, new laundry, new through wall ac units below windows in apt. #3c. no change of use, egress or occupancy.
Non-illuminated non-advertising accessory retractable storefront awning as per approved nyc landmark preservation commission permit cne-26-02565 - original belgian chocolate. no change of use, egress...
Kitchen and batthrooms renovation, new laundry, new through wall ac units below windows in apt. #3c. no change of use, egress or occupancy.
Pl work filed in conjunction with dob now gc, mh and st. no change to use, occupancy or egress.
Proposed modification of existing hall closet to install electric stackable washer and dryer, replacement of bathroom fixtures on existing roughing to accomodate W/D unit. No change to use, occupancy...
Filing to show interior renovation as per plans. modification to existing kitchennette layout and creation of new laundry closet. modification to bathroom to include shower at existing tub location.
Facade repairs as per plans filed herewith. no change in use, egress or occupancy
Filing to show interior renovation of apartment 30b as per plans
Filing to show interior renovation as per plans. modification to existing kitchennette layout and creation of new laundry closet. modification to bathroom to include shower at existing tub location.
Filing to show interior renovation of apartment 30b as per plans
Facade repairs as shown on plans
Facade repairs as per plans filed herewith. no change in use, egress or occupancy
Pl work filed in conjunction with dob now gc, mh and st. no change to use, occupancy or egress.
Non-illuminated non-advertising accessory retractable storefront awning as per approved nyc landmark preservation commission permit cne-26-02565 - original belgian chocolate. no change of use, egress...
Kitchen and batthrooms renovation, new laundry, new through wall ac units below windows in apt. #3c. no change of use, egress or occupancy.
Proposed modification of existing hall closet to install electric stackable washer and dryer, replacement of bathroom fixtures on existing roughing to accomodate W/D unit. No change to use, occupancy...
Installation of suspended scaffolding for facade inspection/repair.
Proposed piping for new washer/dryer. No change to use, occupancy or egress under this application.
Plumbing work related to renovation of apt 15b kitchen & bathrooms as per plans. no change in use, egress or occupancy.
Herewith filing for new combined sprinkler/standpipe system in conjunction with school occupancy change per plans.