Building Permits in ZIP 10128
Manhattan, NY — 774 permits filed recently
774 permits
Repair work to the existing facade, parapets and lightwells. new roof waterproofing to be installed.
Installation of industrial rope access for facade inspections.
Repair work to the existing facade, parapets and lightwells. new roof waterproofing to be installed.
Interior renovation of existing apartment #2D. Work to include non-structural demolition, general construction, and finishes, as per plans filed herewith. No change in use, egress, or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. sidewalk shed located at sidewalk level along the front building face on east 87th street at 404 east 87th...
Filing herewith drawings to install new exhaust manifold location for existing gas dryers. this application does not require a new or amended certificate of occupancy as there is no change in use, egr...
Temporary Platforms on Ramps for Exhibit Sculptures. Temporary sculpture anchored to exterior slab on grade. Temporary partitions for artwork. No alteration to existing structure. Platform, walls, and...
Filing for plumbing work as per plans
Temporary Platforms on Ramps for Exhibit Sculptures. Temporary sculpture anchored to exterior slab on grade. Temporary partitions for artwork. No alteration to existing structure. Platform, walls, and...
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. sidewalk shed located at sidewalk level along the front building face on east 87th street at 404 east 87th...
Filing herewith drawings to install new exhaust manifold location for existing gas dryers. this application does not require a new or amended certificate of occupancy as there is no change in use, egr...
Interior renovation of existing apartment #2D. Work to include non-structural demolition, general construction, and finishes, as per plans filed herewith. No change in use, egress, or occupancy.
The interior renovation of 9th 9th-floor apartment combination per TPPN3/97. No change of use, egress, or occupancy under this application
Installation of temporary shoring and netting as per plans submitted herewith. there is no change in use, egress or occupancy.
Minor renovation at apt 4o on the 4th floor. scope of works as shown in plans. no change in egress, occupancy or use.
Installation of a temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Interior renovation of exisitng residential unit# 25b on the 25th floor for plumbing work; replacement of fixtures in one bathroom and kitchen. no change to use, occupancyor egress
Installation of temporary shoring and netting as per plans submitted herewith. there is no change in use, egress or occupancy.
Installation of a temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
The interior renovation of 9th 9th-floor apartment combination per TPPN3/97. No change of use, egress, or occupancy under this application