Mechanical work including installation of a new self-contained cooling unit and mechanical exhaust vent through a new head transom panel in 1 existing window frame. No change in use, egress, or occupa...
Herewith filing architectural renovations for tunnel connector to 12 east 89th st per plans. no change in use, occupancy or egress under this application.
Herewith filing structural modifications for tunnel connector to 12 east 89th street per plans. no change in use, occupancy or egress under this application.
Herewith filing structural modifications for tunnel connector to 12 east 89th street per plans. no change in use, occupancy or egress under this application.
Herewith filing structural work in conjunction with building enlargement
Herewith filing architectural renovations for tunnel connector to 12 east 89th st per plans. no change in use, occupancy or egress under this application.
Mechanical work including installation of a new self-contained cooling unit and mechanical exhaust vent through a new head transom panel in 1 existing window frame. No change in use, egress, or occupa...
Repair existing cooling tower dunnage at roof of south building including steel beam reinforcement, patching of concrete dunnage frame and temporary shoring of dunnage and mechanical equipment. .
Herewith filing structural modificaitons in conjunction with new school occupancy.
Interior renovations of existing apartment #5B. Work to include non-structural demolition, general construction, and finishes. No change in use, egress, or occupancy.
Partial demolition work to include removal of non-structural masonry wall for new thru-wall self-condenser unit installation below window sill. No structural member will be affected by this work.
Installation of suspended scaffold for facade work and/or inspection. Amend #1, added winsafe 1500 back plate and scaffold anchor detail
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
In unit 7g+7f on floor 7, removal and installation of non-loadbearing partitions as shown on plans to combine two apartments. all plumbing work filed under separate application. no change to egress, u...
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Combination of apartment 2W-3W as per Memo 3/97. Installation of pre-fab steel spiral stair and new floor opening, minor layout changes
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Combination of apartment 2W-3W as per Memo 3/97. Installation of pre-fab steel spiral stair and new floor opening, minor layout changes
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
In unit 7g+7f on floor 7, removal and installation of non-loadbearing partitions as shown on plans to combine two apartments. all plumbing work filed under separate application. no change to egress, u...