Building Permits in ZIP 10128
Manhattan, NY — 764 permits filed recently
764 permits
Blank street coffee-- general construction inclusive of partitions modifications for cafe build-out. no change to use, egress, or occupancy.
Interior renovation of 10th floor apt., work includes removal of non load bearing partitions, new partition layout, new finishes, millwork, flooring; lighting and painting throughout, no change to win...
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Remove non load bearing partition walls where indicated, replace kitchen cabinetry, appliances and plumbing fixtures. NO CHANGE TO USE, EGRESS OR OCCUPANCY, AS OF RIGHT.
Renovation of existing COOP, on 12th floor, (12W) renovate kitchen, (1) bathroom, replace most windows, minor additional construction. MS and Pl filed under separate applications. Interior job only al...
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Renovate exisitng bathrooms and kitchen, remove and replace fixtures in all bathrooms and kitchen as per plans. No change in use, occupancy, or egress.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Renovation of existing COOP, on 12th floor, (12W) renovate kitchen, (1) bathroom, replace most windows, minor additional construction. MS and Pl filed under separate applications. Interior job only al...
Remove non load bearing partition walls where indicated, replace kitchen cabinetry, appliances and plumbing fixtures. NO CHANGE TO USE, EGRESS OR OCCUPANCY, AS OF RIGHT.
Renovate exisitng bathrooms and kitchen, remove and replace fixtures in all bathrooms and kitchen as per plans. No change in use, occupancy, or egress.
North Elevation Facade Repairs, no change in use, egress or occupancy.
Renovation of apartment ph14. partition changes tonon-load-bearing walls as per plans. no change in use,occupancy or egress.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Legalization of two existing apartment units. Combining units 5D & 5E, per TPPN #3/1997. No change in use, egress or occupancy.
Renovation of existing kitchen and three bathrooms
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
Combination of two residential units including selected demolition and reconfiguration. Removal of one kitchen and addition of one powder room. Installation of new fixtures and finishes.
Herewith filing foundation work in conjunction with horizontal and vertical enlargement.
Replace (2) existing PTACS; install (5) new PTACS in new sleeves.