Building Permits in ZIP 10065
Manhattan, NY — 851 permits filed recently
851 permits
Removal of non-load bearing interior partitions and all mechanical equipment in association with full building demoltion, by others. there is no change to use, egress, occupancy, or fire protection.
Interior renovation of a residential duplex apartment including select partition removal; millwork installations; cosmetic upgrades to kitchen, bathrooms and powder room; and painting. No proposed cha...
Installation of heavy-duty sidewalk shed for cornice replacement as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc b...
Herewith filing for interior renovations in apts 5h and 11h as per plans. no change to use occupancy or egress.
Interior renovation of apartment 15e on the 15th floor. no change in use, egress, or occupancy.
Sprinkler infrastructure as per plans submitted.
Herewith filing for interior modifications in units 7c & 10c as per plans. no change to use occupancy or egress.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Plumbing modifications to the plumbing fixtures in units 7C and 10C. NO CHANGE TO USE EGRESS OR OCCUPANCY.
Installation of heavy-duty sidewalk shed for cornice replacement as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc b...
Sprinkler infrastructure as per plans submitted.
Interior renovation of a residential duplex apartment including select partition removal; millwork installations; cosmetic upgrades to kitchen, bathrooms and powder room; and painting. No proposed cha...
Herewith filing for interior renovations in apts 5h and 11h as per plans. no change to use occupancy or egress.
Interior renovation of apartment 15e on the 15th floor. no change in use, egress, or occupancy.
Application filed for Minor furring on 1 & 2; combining units on the third floor and correct certificate of occupancy.
Removal of non-load bearing interior partitions and all mechanical equipment in association with full building demoltion, by others. there is no change to use, egress, occupancy, or fire protection.
Replace existing kitchen sink and dishwasher, replace exstg lav, toilet and tub in bathroom 1, replace existing lav, toilet in bathroom 2, new stall shower in bathroom 2, new washing machine installat...
Gp6 picu: plumbing, sprinkler, and standpipe modifications to accommodate the pediatric icu renoavtion, greenberg pavilion, in the existing hospital building. no change to zoning, use, egress or occup...
Hunter College North Bldg Cooling Tower Steel Dunnage Repairs: Repairs of existing steel beams & girders. Scraping & painting of existing steel lintels/spandrels beams, remove & replace of brick mason...
Installation of underground plumbing for the proposed new building construction.