Building Permits in ZIP 10065
Manhattan, NY — 851 permits filed recently
851 permits
Proposed installation of heavy-duty sidewalk shed and supported scaffold as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no chang...
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Planters and trellises installation at penthouse roof terrace.
Install & relocate plumbing fixtures as per plans
Planters and trellises installation at penthouse roof terrace.
Emergency installation of temporary shoring as shown on the drawings filed herewith. No change in use, egress, or occupancy.
Installation of temporary construction plywood fence as per plans. no change in use, egress or occupancy. fence shall comply with chapter 33 of nyc building code of 2022.
Emergency installation of temporary shoring as shown on the drawings filed herewith. No change in use, egress, or occupancy.
Planters and trellises installation at penthouse roof terrace.
Install & relocate plumbing fixtures as per plans
Installation of temporary construction plywood fence as per plans. no change in use, egress or occupancy. fence shall comply with chapter 33 of nyc building code of 2022.
M480: Install new men's and women's shower and lavatories. Install new drinking fountains. Repair existing toilet rooms as per NYC SCA standards.
Erect illuminated d/f accessory business projecting sign; copy reading n
Installation of temporary beta hoist as per plan. no change in use,egress or occupancy.
Perform minor interior partition demolition & construction inconjunction with apt#1d renovation. reconfigure bathroom & kitchen layout. install new lighting. no change to use, egress, occupancy or fir...
IRA Facade Rope Access Inspection
Mechanical work on the 12th floor as per plans. No change in occupancy, use or egress.
Erect illuminated accessory business channel letters on existing raceway; copy reading neko
Pipe scaffold proposed installation of pipe scaffold as per plan. no change in use,egress or occupancy.
Proposed equipment replacement of existing Autoclave located on the 12th fl room RL-1202 Soiled Utility (Dirty Cage Wash). Patching and repairing of existing finishes as required. No change to occupan...