Building Permits in ZIP 10065
Manhattan, NY — 841 permits filed recently
841 permits
Install medium duty scaffolding as per plans. pipe scaffolding shall comply with chapter 33 of the 2022 nyc building code.
Interior renovation to remove non-lead bearing partitions as per plans filed herewith.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Plumbing work in conjunction with the interior renovation of an existing dwelling unit 11 on the 011 floor. no change in use, occupancy, or egress.
Plumbing work in conjunction with the interior renovation of an existing dwelling unit 12 on the 012 floor. no change in use, occupancy, or egress
Support of excavation in conjunction to NB
Installation of 300psf sidewalk shed, construction fence and pipe scaffolding as per plans. all equipment shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under thi...
Installation of 300psf sidewalk shed, construction fence and pipe scaffolding as per plans. all equipment shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under thi...
Installation of 300psf sidewalk shed, construction fence and pipe scaffolding as per plans. all equipment shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under thi...
Install medium duty scaffolding as per plans. pipe scaffolding shall comply with chapter 33 of the 2022 nyc building code.
Support of excavation in conjunction to NB
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Plumbing work in conjunction with the interior renovation of an existing dwelling unit 11 on the 011 floor. no change in use, occupancy, or egress.
Installation of 300psf sidewalk shed, construction fence and pipe scaffolding as per plans. all equipment shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under thi...
Architectural changes on the 9th floor as indicted on drawings.
Provide temorary core sprinkler protection (tcsp) in accordance with nycbuildings bulletin 2020-012.
L-4 CARDIOLOGY Phase 3: PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE THE PHASE 3, CARDIOLOGY, IN THE EXISTING HOSPITAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRESS OR...
L-4 CARDIOLOGY Phase 3: PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE THE PHASE 3, CARDIOLOGY, IN THE EXISTING HOSPITAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRESS OR...
Provide temorary core sprinkler protection (tcsp) in accordance with nycbuildings bulletin 2020-012.
Installation of industrial rope access for facade inspections.