Building Permits in ZIP 10039
Manhattan, NY — 112 permits filed recently
112 permits
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Non-illuminated non-advertising accessory awning - tax power. no change of use, egress or occupancy.
Non-illuminated non-advertising accessory awning - tax power. no change of use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Mechanical work in conjunction with renovation of 6-story nycha multiple dwelling throughout: installation of new air-conditioning systems, ventilation systems and miscellanceous hvac work; no changes...
Mechanical work in conjunction with renovation of 6-story nycha multiple dwelling throughout: installation of new air-conditioning systems, ventilation systems and miscellanceous hvac work; no changes...
Installation of outriggers for facade repair & inspection.
Respectfully filing for sprinkler work which includes: demolition of existing limited area sprinkler system installation of new limited area sprinkler system.
Facade repairs and replacement of existing parapet with new as per plans. No change in use, egress, or occupancy.
Installation of outriggers for facade repair & inspection.
Respectfully filing for sprinkler work which includes: demolition of existing limited area sprinkler system installation of new limited area sprinkler system.
Facade repairs and replacement of existing parapet with new as per plans. No change in use, egress, or occupancy.
Plumbing work filed in conjuction with new building as per plans filed herewith
Plumbing work filed in conjuction with new building as per plans filed herewith
Application filed to amended the certificate of occupancy to convert existing tenant meeting room to social service office, including replacement of existing entrance door.
Filing for new tenant fit-out plan by adding new service counter; wall mounted shelves, carpentry, interior partition wall, new s.s. hood & exhaust duct to the rear of the bldg. All work as per propos...
Job filed exist. commercial store install new cooking equipment and plumbing fixture per plan. no change of use, egress or occupancy under this application.
Application filed to amended the certificate of occupancy to convert existing tenant meeting room to social service office, including replacement of existing entrance door.