Building Permits in ZIP 10038
Manhattan, NY — 427 permits filed recently
427 permits
BLDG#2_Remove and replace heat exchangers, and connect heat recovery system to existing instantaneous hot water heating in the building.
BLDG#4_Remove and replace heat exchangers, and connect heat recovery system to existing instantaneous hot water heating in the existing tank room.
BLDG#4_Remove and replace heat exchangers, and connect heat recovery system to existing instantaneous hot water heating in the existing tank room.
BLDG#4_Remove and replace heat exchangers, and connect heat recovery system to existing instantaneous hot water heating in the existing tank room.
Installation of new temporary steam piping and condensate piping for temporary boilers as per plans filed herewith.
Replace metal chimney.
Installation of new temporary steam piping and condensate piping for temporary boilers as per plans filed herewith.
Replace metal chimney.
Installation of temporary construction fence as per plans. no change in use, occupancy or egress.
BLDG#4_Remove and replace heat exchangers, and connect heat recovery system to existing instantaneous hot water heating in the existing tank room.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Replacement of (3) rooftop air conditioning units on the lower setback roof. All existing ductwork to remain. No change in use egress and occupancy.
Installation of a temporary chain link construction fence filed in conjunction with M00516712 at NYCHA Building #5 as per plans filed herewith.
BLDG#2_Remove and replace heat exchangers, and connect heat recovery system to existing instantaneous hot water heating in the building.
New 3 Gas Meter/Pipes/Valves/Controls to be installed. New 3 Gas pipe to be connected to existing 3 gas service. New Gas Booster Pump and associated piping, valves controls 4th floor Roof Terrace.
Sprinkler work during lobby renovation
Plumbing work for lobby renovation
Mechanical work associated with installing VRF refrigerant lines and indoor units from the cellar to the 29th floor in the corridors and home offices and connecting to condenser units on the roof bulk...
Install 546LF of Temporary Sidewalk Shed around PS 126 School Building in conjunction with DOB Job # 103652352
New 3 Gas Meter/Pipes/Valves/Controls to be installed. New 3 Gas pipe to be connected to existing 3 gas service. New Gas Booster Pump and associated piping, valves controls 4th floor Roof Terrace.