Building Permits in ZIP 10038
Manhattan, NY — 426 permits filed recently
426 permits
Use of mini crane construction equipment as per plans filed herewith
Installation of a temporarily shanty per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
BLDG#7_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
Installation of a temporarily shanty per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Use of mini crane construction equipment as per plans filed herewith
Temporary work platform located at FL 032 to be removed once beam work is complete
BLDG#7_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
NYCHA BOILER_BLDG#8_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
NYCHA BOILER_BLDG#8_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Herewith filing for modification of existing sprinkler system on the 2nd floor,add sp. main in bas.sp. risers in 1st fl. stairwell,& add automatic SP system on 2nd fl Pl. is replacing exist fixtures a...
Interior demolition including removal of all non-structural interior partitions, furring and finishes.
NYCHA BOILER_BLDG#8_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
General construction for lobby renovation
NYCHA BOILER_BLDG#9_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
NYCHA BOILER_BLDG#9_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
BLDG#7_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
Interior demolition including removal of all non-structural interior partitions, furring and finishes.
Herewith filing for modification of existing sprinkler system on the 2nd floor,add sp. main in bas.sp. risers in 1st fl. stairwell,& add automatic SP system on 2nd fl Pl. is replacing exist fixtures a...
BLDG#7_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.