Building Permits in ZIP 10036
Manhattan, NY — 955 permits filed recently
955 permits
Herewith filed to modify existing sprinkler heads and associated assemblies to align with the new restaurant layout. plumbing scope: remove one sink and cap connections (new pl install filed under m01...
5TH FLOOR DEMO-- PRE-TENANT INTERIOR NON-STRUCTURAL DEMOLITION INCLUSIVE OF PARTITIONS REMOVALS AS PER PLANS FILED. No change to use, egress, or occupancy.
Modifications to plumbing and sprinkler systems as per plans filed herewith. No change of use, occupancy or egress.
Interior renovation of existing office space including the installation of partitions, doors, floors, and finishes on the 33rd Floor (Moroccanoil Office), as per plans. No change to use, egress, or oc...
5th floor- modification to existing sprinkler system, demolition of branch pipiing and sprinkler heads. installation of tcsp as per plans filed.
Modifications to the existing plumbing system on the 14th & 17th Floors (ICBC) as per plans. No change to use, egress or occupancy.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building code chapter 33. No change in use, egress and/or occupancy with this application.
Installation of interior non-bearing partitions and related finishes as per drawings filed herewith. no change in use, egress or occupancy.
Plumbing work being filed in conjunction with Alteration 2 application number 123771276 to renovate units on the 24th through 27th floors and public halls. No change to use, egress or occupancy.
Installation of curtain wall, storefront and adjacent metal cladding as per plans filed herewith. No change in use, occupancy or egress.
Sprinkler work for ING Financial on 10th and 11th floor
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Modifications and additions to the existing HVAC system on the 14th and 17th Floors (ICBC), including modifications of ductwork and piping, and the addition of water source heat pumps as per plans. No...
Reinforcement at 30th floor to accommodate increased live load as shown on drawings. No change in use, egress or occupancy.
Modification to existing pluming fixtures and related piping as shown on drawings. no change to use, egress or occupancy/
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building code chapter 33. No change in use, egress and/or occupancy with this application.
Plumbing work in conjuction with interior renovation of the hotel dweling units ( rooms) for accessibility compliance. no change in use egress or occupancy.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Demolition of the existing interior build out and core toilets as shown on drawings. No change in use, egress or occupancy.
Interior renovation of the hotel dweling units ( rooms) for accessibility compliance. no change in use egress or occupancy.