Building Permits in ZIP 10036
Manhattan, NY — 955 permits filed recently
955 permits
Installation of new plumbing fixtures and associated piping on the Cellar Floor (Buildout Phase) as per plans. No change to use, egress or occupancy.
6th FLOOR MER-- Modifications to existing sprinkler system, add sprinkler piping and new heads as per plans filed.
Modifications and minor interior demolition of the existing HVAC system, including removals of ducts and piping on Floors 9, 34, 35, 37, as per plans. No change to use, egress, or occupancy.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Renovation of Elevator Lobbies. No change to Use, Occupancy, or Egress.
Application filed for the change of use for a new eating and drinking establishment in the cellar as shown on the filed plans.
Installation of suspended scaffold for facade work or inspection.
Application filed for the change of use for a new eating and drinking establishment in the cellar as shown on the filed plans.
Installation of new plumbing fixtures and associated piping on the Cellar Floor (Buildout Phase) as per plans. No change to use, egress or occupancy.
6th FLOOR MER-- Modifications to existing sprinkler system, add sprinkler piping and new heads as per plans filed.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of suspended scaffold for facade work or inspection.
Minor interior demolition of existing office space including interior partitions, doors, suspended ceilings on Floors 9, 34, 35, 37, as per plans. No change to use, egress, or occupancy.
Renovation of Elevator Lobbies. No change to Use, Occupancy, or Egress.
Modifications and minor interior demolition of the existing HVAC system, including removals of ducts and piping on Floors 9, 34, 35, 37, as per plans. No change to use, egress, or occupancy.
Minor demolition with installation of new partitions, doors, ceilings and finishes on the 12th, 24th and 25th floors as per plans. No change to use, egress or occupancy.
Proposed to cut, cap and demolish sprinkler system in conjunction with full demo job # m01232441. no change to use, egress or occupancy under this application.
Installation of temporary contractor shed as per plans.
Protection supported from the roof level as required for the repairs to the existing parapet. No change in occupancy, use, or egress.
Installation of temporary contractor shed as per plans.