Building Permits in ZIP 10036
Manhattan, NY — 946 permits filed recently
946 permits
Removal of interior non-load bearing partitions and related finishes on subcellar one floor through roof level. There is no change in use, egress or occupancy as part of this application
Sign structure removal lower tower sign. No change of use, egress or occupancy
Partial trenching of 15th floor slab & removal of insolation around existing piping.
Application filed for ll 11/87 facade repairs as per plans here within. no change in use, occupancy, or egress.
Partial trenching of 15th floor slab & removal of insolation around existing piping.
Removal of interior non-load bearing partitions and related finishes on subcellar one floor through roof level. There is no change in use, egress or occupancy as part of this application
Sign structure removal lower tower sign. No change of use, egress or occupancy
Hereby filing for the renovation of unit 2c (installation of plumbing fixtures). no change in use, egress or occupancy.
Plumbing modifications taking place on the 6th floor (8th floor marketing) as indicated on the drawings.
Application filed for ll 11/87 facade repairs as per plans here within. no change in use, occupancy, or egress.
Removal mechanical/hvac components throughout building as per plans. There is no change in use, egress or occupancy as part of this application.
Application filed for ll 11/87 facade repairs as per plans here within. no change in use, occupancy, or egress.
Sprinkler modifications taking place on the 6th floor (8th floor marketing) as indicated on the drawings.
Installation of suspended scaffold for facade work or inspection.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Mechanical modifications taking place on the 6th floor (8th floor marketing) as indicated on the drawings.
Construction modifications taking place on the 6th floor (8th floor Marketing) as indicated on the drawings.
Mechanical work for ING Financial on 10th and 11th floor
Mechanical modifications taking place on the 6th floor (8th floor marketing) as indicated on the drawings.
Sprinkler modifications taking place on the 6th floor (8th floor marketing) as indicated on the drawings.