Building Permits in ZIP 10032
Manhattan, NY — 284 permits filed recently
284 permits
9th Cycle FISP Repairs. No change in use, egress or occupancy.
9th cycle FISP repairs. No change in use, egress or occupancy.
Installation of outrigger and material hoist for the facade repair work as per plan submitted.
Install of heavy duty sidewalk shed, storage area on top no more than 25psf and pipe scaffold as per plans in compliance with chapter 33 of nycbc. no change in use, agress, or occupancy under this app...
Facade restoration for cycle 9a, window replacement as per plans filed herewith. no change to use, egress or occupancy filed under this application.
Install of heavy duty sidewalk shed, storage area on top no more than 25psf and pipe scaffold as per plans in compliance with chapter 33 of nycbc. no change in use, agress, or occupancy under this app...
9th cycle FISP repairs. No change in use, egress or occupancy.
Facade restoration for cycle 9a, window replacement as per plans filed herewith. no change to use, egress or occupancy filed under this application.
Installation of outrigger and material hoist for the facade repair work as per plan submitted.
9th Cycle FISP Repairs. No change in use, egress or occupancy.
Installation of 300psf sidewalk shed as per plans. sidewalk shed shall comply with chapter 33 of nyc code 2022. no change in use, occupancy or egress under this application.
Installation of 300psf sidewalk shed as per plans. sidewalk shed shall comply with chapter 33 of nyc code 2022. no change in use, occupancy or egress under this application.
Milstein cwp: structural slab replacement and framing to accommodate the chiller replacement in the existing milstein hospital building as per plans filed herewith.
Proposed interior renovation for the tenant fit-out to the existing space, install new non-bearing partitions and doors, no change in use, egress and occupancy.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Milstein cwp: modifications to hvac ductwork and piping including the installation of 6 condenser water pumps to accommodate the chiller replacement in the existing milstein hospital building as per p...
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Milstein cwp: modifications to hvac ductwork and piping including the installation of 6 condenser water pumps to accommodate the chiller replacement in the existing milstein hospital building as per p...
Proposed interior renovation for the tenant fit-out to the existing space, install new non-bearing partitions and doors, no change in use, egress and occupancy.
Milstein cwp: structural slab replacement and framing to accommodate the chiller replacement in the existing milstein hospital building as per plans filed herewith.