Building Permits in ZIP 10032
Manhattan, NY — 284 permits filed recently
284 permits
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
M028, installation of boiler breeching, chimney, steam, condensate & makeup water pipings, submitting on behalf of contractor in conjunction with dob # 103651629. no change in use, egress or occupancy
IRA Facade Inspection as per the plans
Facade repairs to comply with ll11/1998. no change in use, egress or occupancy.
Installation of a temporary fire protection sprinkler system on the 4th floor at the nyp service building - gmp 4 as per plans submitted herewith, no change in use, egress or occupancy group.
Facade repairs to comply with ll11/1998. no change in use, egress or occupancy.
Installation of a temporary fire protection sprinkler system on the 4th floor at the nyp service building - gmp 4 as per plans submitted herewith, no change in use, egress or occupancy group.
Hp sp: sprinkler modifications throughout as indicated on plans filed herewith.
interior renovation of apartment- replace and add new plumbing's fixtures
Hp sp: sprinkler modifications throughout as indicated on plans filed herewith.
interior renovation of apartment- replace and add new plumbing's fixtures
Air-cooled Condensing unit replacement along with new Interior Air Handling units and associated piping and ductwork to be installed.
Renovation at existing restaurant. installing new bar, new countertops, new flooring, new interior finishes and new bathroom framing. plumbing to be filed separately. no other work proposed. no change...
Existing 5 story mixed used building with interior renovation on partition work in apt#14. no change in use, means of egress or occupancy.
Install 5 new gas cooking equipments in an existing chinese take out at existing commercial building-replace plumbing fixtures
Installation of Metal Deck to support the existing concrete slab in relation to the proposed repairs under job# M00941092-S2.
Interior renovation of nonbearing partitions, no change in use, egress or occupancy
Install 5 new gas cooking equipments in an existing chinese take out at existing commercial building-replace plumbing fixtures
Existing 5 story mixed used building with interior renovation on partition work in apt#14. no change in use, means of egress or occupancy.
Interior renovation of nonbearing partitions, no change in use, egress or occupancy