Building Permits in ZIP 10029
Manhattan, NY — 590 permits filed recently
590 permits
Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. no change in use occupancy or egress under this application. live load 300 per square feet. sidewalk shed shall com...
Herewith file to renovate exist. apartment unit #1. work includes new/replace plumbing fixtures with associated plumbing elements, and fire-stopping is provided. no change in use, egress, and occupanc...
Herewith file to renovate exist. apartment unit #1. work includes new/replace plumbing fixtures with associated plumbing elements, and fire-stopping is provided. no change in use, egress, and occupanc...
Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. no change in use occupancy or egress under this application. live load 300 per square feet. sidewalk shed shall com...
Amendment for Suspended Scaffold out rigger installation for Facade inspections
Installation of temporary sidewalk shed as per plans. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
Installation of temporary 8 feet high chain link fence with debris mesh netting. no change in use, egress, and occupancy.
Filing herewith for the modification of existing rooftop steel dunnage and installation of new. dunnage
Nycha east river boilers consisting of mechanical work as per plans filed herewith. no change to use, egress, or occupancy.
Installation of temporary 8 feet high chain link fence with debris mesh netting. no change in use, egress, and occupancy.
Installation of temporary sidewalk shed as per plans. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
Filing herewith for the modification of existing rooftop steel dunnage and installation of new. dunnage
Nycha east river boilers consisting of mechanical work as per plans filed herewith. no change to use, egress, or occupancy.
Providing roofing replacement, parapet replacement including 14th floor exterior facade work from 14th floor lintel to roof level and rooftop structure repairs and entrance canopy roofing. no change i...
Facade Local Law 11/98 Cycle 9 Repairs. No changes in use, occupancy and egress.
Providing roofing replacement, parapet replacement including 14th floor exterior facade work from 14th floor lintel to roof level and rooftop structure repairs and entrance canopy roofing. no change i...
Installation of plumbing fixtures throughout the building, all as per plans filed herewith.
Facade Local Law 11/98 Cycle 9 Repairs. No changes in use, occupancy and egress.
Providing roofing replacement, parapet replacement including 14th floor exterior facade work from 14th floor lintel to roof level and rooftop structure repairs and entrance canopy roofing. no change i...