Temporary hoist run-back structure during facade replacement, filed separately. run-back structure shall comply with ch #33 of the nyc bldg code. no change in use, occupancy or egress under this appli...
Installation of a temporary sprinkler fire protection system on a white-box area located on the 12th floor as per plans submitted herewith, no change in use, egress or occupancy group.
Heavy duty sidewalk shed during facade replacement, filed separately under app # m01311055. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this appli...
Plumbing related work in conjunction with Boiler Replacement. Installation of new hot water boiler/heaters, new gas service lines and plumbing components.
General Construction & Mechanical related work in conjunction with Boiler Replacement. Modification to existing tank room to accommodate installation of new hot water heaters and new chimney steel lin...
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Heavy duty sidewalk shed during facade replacement, filed separately under app # m01311055. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this appli...
Equipment use: single 12125 # capacity personnel hoist during facade replacement, filed sep. hoist shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application....
Temporary hoist run-back structure during facade replacement, filed separately. run-back structure shall comply with ch #33 of the nyc bldg code. no change in use, occupancy or egress under this appli...
GC, Structural & foundation related to New Building # 122132101
Plumbing related work in conjunction with Boiler Replacement. Installation of new hot water boiler/heaters, new gas service lines and plumbing components.
Temporary roof protection as per drawings. roof protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Mechanical application for Tenant space as per plans filed
Installation of a temporary sprinkler fire protection system on a white-box area located on the 12th floor as per plans submitted herewith, no change in use, egress or occupancy group.
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Temporary overhead protection as per drawings. overhead protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
General Construction & Mechanical related work in conjunction with Boiler Replacement. Modification to existing tank room to accommodate installation of new hot water heaters and new chimney steel lin...
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration. Replacement of existing entrance with new reinforced concrete walls, and slab for new cellar hatch with vertical ladder...
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration. Replacement of existing entrance with new reinforced concrete walls, and slab for new cellar hatch with vertical ladder...