Building Permits in ZIP 10028
Manhattan, NY — 692 permits filed recently
692 permits
Foundation, concrete slab and masonry work and Structural framing and reinforcements for alteration.
Great hall gallery package 2. renovations as per plans filed herewith. no change in use, egress or occupancy
Installation of pipe scaffolding as per plans. scaffold shall comply with chapter #33 of the 2022 code. no change in use, egress, and occupancy under this application.
Vertical enlargement of exist building.
Joist replacement and reinfoircement of existing joists at multiple floors. no change in use, egress, or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of suspended scaffold for facade inspection/repair.
Joist replacement and reinfoircement of existing joists at multiple floors. no change in use, egress, or occupancy.
Vertical enlargement of exist building.
Change use of building to community facility. Enlarge building on floors 3 thru 6. Install new egress stair.
Installation of pipe scaffolding as per plans. scaffold shall comply with chapter #33 of the 2022 code. no change in use, egress, and occupancy under this application.
Great hall gallery package 2. renovations as per plans filed herewith. no change in use, egress or occupancy
Installation of a temporary engineered enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Foundation, concrete slab and masonry work and Structural framing and reinforcements for alteration.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Install foundations as per plans filed. subsequent filing to nb #m00625489.
filing structural and foundation work in conjunction with M01266575I1
Great hall gallery package 2. plumbing and sprinkler work as per plans filed herewith.
Installation of temporary personnel material hoist as per plans. no change in use, egress or occupancy.
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.