Redevelopment of buildings 10 and 12 at outside premises (osp), including site improvements as part of building renovations. no change to use, egress or occupancy.
Cut and point bricks, and rebuild brickwork in various locations. Replace damaged window sills. Repair stones with epoxy. Repair chipped facade stones.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Suspended Scaffold Installation for Facade Restoration and Inspection
Cut and point bricks, and rebuild brickwork in various locations. Replace damaged window sills. Scrape prime and paint A/C louvers.
Filed for interior & exterior renovations of existing non elevator prior-to-1968 code, class 3-nfp multiple dwelling as per plans filed herewith; no change proposed to use, egress, or occupancy.
Removal of the existing masonry column, Interior Foundation and Structural framing work as shown on plan set filed herewith for renovation to SRO Class-B property. Building is currently and will remai...
Installation of temporary suspended scaffold equipment.
Installation of temporary suspended scaffold equipment.
Cut and point bricks, and rebuild brickwork in various locations. Replace damaged window sills. Repair stones with epoxy. Repair chipped facade stones.
Suspended Scaffold Installation for Facade Restoration and Inspection
Removal of the existing masonry column, Interior Foundation and Structural framing work as shown on plan set filed herewith for renovation to SRO Class-B property. Building is currently and will remai...
Filed for interior & exterior renovations of existing non elevator prior-to-1968 code, class 3-nfp multiple dwelling as per plans filed herewith; no change proposed to use, egress, or occupancy.
Cut and point bricks, and rebuild brickwork in various locations. Replace damaged window sills. Scrape prime and paint A/C louvers.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Proposed structural work to create floor & wall openings for new stairway for basement & first floors. modifications to cellar window and openings. no change in use, occupancy or egress.
Rope access installation for facade access and inspections
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
File suspended scaffold outrigger systems for facade restoration and inspection.