Building Permits in ZIP 10025
Manhattan, NY — 734 permits filed recently
734 permits
Proposed filing for Boiler Replacement.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Proposed PL filing in-conjunction with Alteration type 1 # 123256877
Plumbing work filed in conjunction with GC for interior renovation of Apt# 5E for the removal and replacement of plumbing fixtures and kitchen fittings. No change in use, occupancy or egress.
Relocation of cold water domestic distribution from roof to cellar. installation of pressure boosting system. no change in egress or occupancy.
Msm sp n - sprinkler modifications according to plans filed herewith. no change to use egress or occupancy.
General construction related to the relocation of cold water domestic distribution from roof to cellar. installation of pressure boosting system. no change in egress or occupancy.
Installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
interior renovation of apt. 10S demolition and construction of misc. non-bearing partitions, gypsum board ceilings and soffits, fittings and finishes, lighting, switching and electrical as per plan. n...
Temporary Structural Bracing of beams in unit PH601. Initial General Construction and subsequent Structural application have been filed. No changes to Use, Egress, or Occupancy.
Installation of heavy duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code.
Application file to exist. chimney remove and replace new double wall stainlesssteel exterior chimney from basement-boiler room to be extended 4 feet above parapet wall as per plan. hpd omo#no change...
VERTICAL ENLARGEMENT OF EXISTING MUSEUM TO INCLUDE NEW COMMUNITY TERRACE. DEV HUB CONSULTATION COMPLETED 1/22/24- Rami Bitar
Temporary Structural Bracing of beams in unit PH601. Initial General Construction and subsequent Structural application have been filed. No changes to Use, Egress, or Occupancy.
Relocation of cold water domestic distribution from roof to cellar. installation of pressure boosting system. no change in egress or occupancy.
Installation of heavy duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code.
General construction related to the relocation of cold water domestic distribution from roof to cellar. installation of pressure boosting system. no change in egress or occupancy.
Installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
Msm sp n - sprinkler modifications according to plans filed herewith. no change to use egress or occupancy.
VERTICAL ENLARGEMENT OF EXISTING MUSEUM TO INCLUDE NEW COMMUNITY TERRACE. DEV HUB CONSULTATION COMPLETED 1/22/24- Rami Bitar