Building Permits in ZIP 10025
Manhattan, NY — 723 permits filed recently
723 permits
Replacement of 18 ton hvac system on floor 001. no change to egress, use, or occupancy.
Installation of industrial rope access for facade inspections
Proposed installation of a temporary pipe scaffolding as per plans submitted. work shall comply with building code, chapter 33. no changes in use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
Proposed installation of a temporary sidewalk shed as per plans submitted. work shall comply with 2022 building codes, chapter 33. no change in use, egress, or occupancy.
Proposed garage repairs as per plans submitted herewith. there is no change in use, egress or occupancy.
Proposed installation of a temporary pipe scaffolding as per plans submitted. work shall comply with building code, chapter 33. no changes in use, egress or occupancy.
Proposed garage repairs as per plans submitted herewith. there is no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
Proposed installation of a temporary sidewalk shed as per plans submitted. work shall comply with 2022 building codes, chapter 33. no change in use, egress, or occupancy.
Interior renovation of unit 5d within existing multi-family building. no increase in the bulk . no impact on zoning. no change in use, egress, or occupancy.
Installation, relocation and removal of plumbing fixtures as shown on plans filed herewith.
Interior renovation as shown on plans filed herewith.
inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Diego Buri Cumbe
Installation of Heavy-Duty Sidewalk Shed. No change in use, occupancy, or egress.
inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Diego Buri Cumbe
Interior renovation of unit 5d within existing multi-family building. no increase in the bulk . no impact on zoning. no change in use, egress, or occupancy.
Installation, relocation and removal of plumbing fixtures as shown on plans filed herewith.
Interior renovation as shown on plans filed herewith.
Installation of Heavy-Duty Sidewalk Shed. No change in use, occupancy, or egress.