Building Permits in ZIP 10025
Manhattan, NY — 734 permits filed recently
734 permits
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Removal and installation of plumbing fixtures and related piping as shown on the plan set filed herewith. No change to use, egress, or occupancy under this application.
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Gabriel Hurtado
Exterior facade repairs including brick rebuilding, parapet rebuilding, cut and point, lintel replacement and window sill repairs
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Exterior facade repairs, waterproofing, brick replacement, pointing, lintel repairs. No change in use egress or occupancy
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Exterior facade repairs, waterproofing, brick replacement, pointing, lintel repairs. No change in use egress or occupancy
Removal and installation of plumbing fixtures and related piping as shown on the plan set filed herewith. No change to use, egress, or occupancy under this application.
Exterior facade repairs including brick rebuilding, parapet rebuilding, cut and point, lintel replacement and window sill repairs
Inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Gabriel Hurtado
Gutt renovation of apartment 5an. minor partition and plumbing alteration. no change in use, egress or occupancy.
Masonry facade repairs and replacing flat roofing at the one story extension. No change to use, egress or occupancy.
1. New mechanical mezzanine between 1st & 2nd Floor. 2. First Floor partial demolition and reframing 3.Cellar and First Floor slab infill 4. New elevator.
Proposed exterior facade restoration as per plans filed herewith. no change in use, egress or occupancy.
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Minor interior renovation at apt 10b including partitions, cabinets, fixtures and finishes. no change to building occupancy, egress or floor area.
1. New mechanical mezzanine between 1st & 2nd Floor. 2. First Floor partial demolition and reframing 3.Cellar and First Floor slab infill 4. New elevator.