Building Permits in ZIP 10024
Manhattan, NY — 731 permits filed recently
731 permits
Supported Scaffold
Mechanical filing subsequent to gc filing - design includes the installation of air conditioning system. no change in use, egress, or occupancy under this filing.
Limited Facade Repairs. Patching of the deteriorated concrete
Fn/ps334m - for temporary construction equipment (fence)submitting on behalf of contractor, related to job #m00672512, no change in use,occupancy or egress
HVAC system for Apartment #8W on the 8th floor. No change to use, egress or occupancy.
Extending existing capped commercial kitchen exhaust riser on the exterior of the building from the second-floor setback roof to the main roof. No interior work. Total construction floor area: 0 squar...
Replacement of split hvac system on in the basement, floor 001, floor 002, floor 003, floor 004, and the roof. no change to egress, use, or occupancy.
Installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Interior renovation includes merging Apartment 3DA and 3DB. No change in use, egress and occupancy.
Ps 009m, installation of +/- 615 linear feet of temporary 8 feet high chain link fence and +/- 16 linear feet of sidewalk shed submitting on behalf of contractor in conjunction with dob # 103652370 an...
Interior renovation in apt 7a filed in conjunction with dob now pl. no change to use, occupancy or egress.
Total windows replacement and caulking. As per plans .
New partition and ceiling work, new rear yard steps to cellar, install residential elevator
Ps 009m, installation of temporary boiler breeching / stack, steam, and condensate piping submitting on behalf of contractor in conjunction with dob # 103652370. no change in use, egress, or occupancy...
Ps-009m, installation of supported scaffold on the roof submitting on behalf of contractor in conjunction with dob # 103652370 for new chimney liner/s installation. no change in use, egress, or occupa...
Remove and replace roof drains & assoc. storm piping & Reflash vent stacks on the roof. Installation of new drainage storm piping in the Basement. Replace existing hot water heaters with heat pumps &...
Replace existing Roof systems , Parapets, Replacement. Replacement of Steel Lintels at identified locations thruought the school . Raise existing sills at roof bulkheads. as per plans filed herewith.
Replacement of split hvac system on in the basement, floor 001, floor 002, floor 003, floor 004, and the roof. no change to egress, use, or occupancy.
Interior renovation in apt 7a filed in conjunction with dob now pl. no change to use, occupancy or egress.
Replace existing Roof systems , Parapets, Replacement. Replacement of Steel Lintels at identified locations thruought the school . Raise existing sills at roof bulkheads. as per plans filed herewith.