Building Permits in ZIP 10024
Manhattan, NY — 731 permits filed recently
731 permits
Herewith filing mechanical modifications in conjunction with apt 5a/5b combination. no change in use, occupancy or egress under this application.
Herewith filing to combine apartments 5a and 5b as per tppn 3/97. no change to use, egress or occupancy under this application
Temporary installation of a sidewalk shed and construction fence as per drawings during new building work . no change in use, egress, and occupancy. sidewalk shed and construction fence to comply with...
Plumbing work to renovate Apt 6S, kitchen, two full bathrooms, and laundry closet.
Replace portions of exist fin ceiling to accomodate ductwork replacements.as shown on plans. mechanical work for installation of new energy recovery ventilation (erv) system to be filed under subseque...
Filing here with mechanical work for apartment 8j at the address listed. includes new water source heat pump (wshp) systems and toilet exhaust system connected to existing base building riser.
Rooftop solar installation. no change to use, occupancy or egress.
Enlargement of 2 window openings at Penthouse unit. No Change to Use, Egress or Occupancy.
Installation of outrigger for facade repair.
Proposed installation of temporary pipe scaffold stair tower as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this applicati...
Renovations to apt 6e as per plans filed herewith. no change in use, egress or occupancy
Enlargement of 2 window openings at Penthouse unit. No Change to Use, Egress or Occupancy.
Installation of outrigger for facade repair.
Rooftop solar installation. no change to use, occupancy or egress.
Renovations to apt 6e as per plans filed herewith. no change in use, egress or occupancy
Filing here with mechanical work for apartment 8j at the address listed. includes new water source heat pump (wshp) systems and toilet exhaust system connected to existing base building riser.
Mechanical work filed in conjunction with GC for lobby area renovation. Installation of new ductwork to serve the new lobby layout. No change in use, occupancy or egress.
Installation of outriggers for facade repair and inspection
Apartment renovation, including minor wall relocations, bathroom and kitchen replacement.
Interior renovation of apartment 9. No change to occupancy, use or egress.