Building Permits in ZIP 10024
Manhattan, NY — 731 permits filed recently
731 permits
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Interior renovation of existing apartment (#8W) on the 8th floor. No change to use, egress or occupancy.
General Construction work related to apartment renovation
Remodel apt 4c on the 3rd floor, apt 5a on the 4th floor and apt 6a on the 5th floor. no change in use, egress or occupancy.
Herewith filing for interior renovation of exisitng apartment # 2 as per plans.no changes to use, egress or occupancy.
Demo in apt 2d filed in conjunction with dob now gc and pl. no change to use, occupancy or egress.
Demo in apt 2d filed in conjunction with dob now gc and pl. no change to use, occupancy or egress.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of new kitchen, bathroom, laundry fixtures with piping in Apt. #8W on the 8th floor. No change to use, egress or occupancy.
Remodel rear apt on basement level and relocate stairs to recreation room. no change in use, egress or occupancy.
General Construction work related to apartment renovation
Interior renovation of existing apartment (#8W) on the 8th floor. No change to use, egress or occupancy.
Herewith filing for interior renovation of exisitng apartment # 2 as per plans.no changes to use, egress or occupancy.
Remodel apt 4c on the 3rd floor, apt 5a on the 4th floor and apt 6a on the 5th floor. no change in use, egress or occupancy.
Apt 15/16b interior dwelling unit minor interior renovation modification of kitchen, non-bearing wall modifications.renovate 4 bathrooms. new finishes and fixtures. no change of use/occupancy or egres...
Installation of temp-standpipe for proposed 18 story mixed use building with cellar.
Renovation of the existing apartments 5a and 5r at 5th floor, combination to be in compliance with tppn #3/97. there willbe no change of use, occupancy or egress.
Interior renovation of existing apartment. remove and install non-structural partitions and finishes. replace plumbing fixtures. no change in use, egress or occupancy.
Renovation of the existing apartments 5a and 5r at 5th floor, combination to be in compliance with tppn #3/97. there willbe no change of use, occupancy or egress.
Installation of temp-standpipe for proposed 18 story mixed use building with cellar.