Building Permits in ZIP 10023
Manhattan, NY — 1,042 permits filed recently
1,042 permits
Hereby filing plumbing work at 23rd floor unit 23h as per plans
Filing for the Installation of Plumbing Fixtures on 4th Floor as well as filing for the removal, relocation,and installation of Sprinkler Heads on 4th floor. No change to Use, Egress or Occupancy.
Plumbing work in conjunction with apartment 6c renovation as per pans filed herewith. no change in use, egress, or occupancy.
Interior renovation of apartment 2b2c on the 002 and 003 floors. no change in use, occupancy, or egress.
Filing for exterior work, including penthouse terrace and penthouse main roof replacement. No change in use, egress, or occupancy.
Garage repairs as per plans submitted herewith. there is no change in use, egress or occupancy.
Combination of apts 30fg filed in conjunction with dob now pl under tppn 3/97 . no change to use, occupancy or egress.
Modify existing sprinkler system to accommodate the renovated space. This include demolitions, relocation and new devi e installations. All modifications shall be performed in accordance with NYC BC,...
The scope of work for this project is to modify the existing plumbing system to accommodate the renovated space. thisincludes demolition, and new plumbing fixture installations. all modifications shal...
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Garage repairs as per lans submitted herewith. there is no change in use, egress or occupancy.
Garage repairs as indicated on plans submitted herewith. there is no change in use, egress or occupancy.
Illuminated non-advertising accessory wall sign - car return avis car pick up. no change of use, egress or occupancy.
Proposed installation of a temporary heavy duty 300PSF sidewalk shed as per plans submitted. Work shall comply with2022 building codes, chapter 33. No change in use, egress or occupancy.
HEREWITH FILING FOR INTERIOR RENOVATION OF APT. 5 AS PER PLANS FILED HEREWITH. wORK TO BE INTERIOR PARTITIONS AND FINISHES. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Installation of temporary shoring as per plans submitted herewith. there is no change in use, egress or occupancy.
Filing herewith structural scope for the removal of the historical Guggenheim bandshell. No change in use, occupancy, or egress under this application.
Filing herewith structural scope for the removal of the historical Guggenheim bandshell. No change in use, occupancy, or egress under this application.
Facade Repairs
Garage repairs as per lans submitted herewith. there is no change in use, egress or occupancy.