Building Permits in ZIP 10023
Manhattan, NY — 1,042 permits filed recently
1,042 permits
At cellar and 1st floor, removal and installation of interior partitions, ceilings, finishes, millwork, and interior convenience stairs as per plans filed herewith. no change to use, occupnacy, or egr...
Installation of ouriggers for facade repair and inspection
Renovation of existing triplex apartment . this alteration will consist of a new kitchen and bathrooms. the existing convenience stairs n the apartment are to be reconstructed as per plans. new exteri...
Renovation of existing triplex apartment . this alteration will consist of a new kitchen and bathrooms. the existing convenience stairs n the apartment are to be reconstructed as per plans. new exteri...
Installation of heavy duty sidewalk shed as per plans. shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Interior modification of unit 25a including the modification of the kitchen, bathrooms, and finishes throughout. no change in use occupancy or egress is proposed in this application
Installation of temporary rooftop mockup for landmarks (lpc) review.
Hereby filing general construction work at 36th floor unit 36c as per plans. no change in use, egress, occupancy
At cellar and 1st floor, installation of new ac units and associated ductwork and piping, supplemental ac unit to serve it room, and new outside air and exhaust fans as per plans filed herewith. no ch...
Temporary structures for a red carpet at JRP plaza. Removed at the end of the programing. No changes to existing structures, use or egress.
At cellar and 1st floor, removal and installation of interior partitions, ceilings, finishes, millwork, and interior convenience stairs as per plans filed herewith. no change to use, occupnacy, or egr...
Hereby filing general construction work at 36th floor unit 36c as per plans. no change in use, egress, occupancy
Interior modification of unit 25a including the modification of the kitchen, bathrooms, and finishes throughout. no change in use occupancy or egress is proposed in this application
Renovation of existing triplex apartment . this alteration will consist of a new kitchen and bathrooms. the existing convenience stairs n the apartment are to be reconstructed as per plans. new exteri...
Installation of ouriggers for facade repair and inspection
Installation of heavy duty sidewalk shed as per plans. shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of temporary rooftop mockup for landmarks (lpc) review.
mechanical modifications throughout
Renovate existing kitchen and master bathroom at Apt 9B. Minor interior non-bearing partitions and millwork. New drop ceilings. New thru-wall openings for AC condensing units.
Replacement (1) new gas fired hot water boiler. (hallways) no change in means of egress use group or occupancy.