Building Permits in ZIP 10023
Manhattan, NY — 1,043 permits filed recently
1,043 permits
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Structural modifications as per plans. no change in use, egress or occupancy.
Interior renovation of apt. 4d to include new partitions, finishes, and cabinetry as per plan. plumbing filed under separate application. no change to the bulk, use, egress, and occupancy under this a...
Ansonia endoscopy asc reno - mechanical modifications as per plans filed herewith. no change in use, egress, or occupations.
Heavy duty sidewalk shed as per hpd emergency declaration. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Installation of new water cooled VRF system, kitchen, dryer, and toilet exhaust system in Apartment #3/4 N on the 3rd and 4th floor. No change to use, egress, or occupancy.
full demolition of 22 story structure using hand held and mechanical equipment to assist.
Swimming Pool, Natatorium and Locker Room full renovation.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Swimming Pool, Natatorium and Locker Room full renovation.
Installation of new water cooled VRF system, kitchen, dryer, and toilet exhaust system in Apartment #3/4 N on the 3rd and 4th floor. No change to use, egress, or occupancy.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Structural modifications as per plans. no change in use, egress or occupancy.
Interior renovation of apt. 4d to include new partitions, finishes, and cabinetry as per plan. plumbing filed under separate application. no change to the bulk, use, egress, and occupancy under this a...
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Replacement (3) new gas fired hot water heaters with integral burners (domestic hot water). new low pressure gas service, booster, and meter. in conjunction with dob#122011857 no change in means of eg...
Heavy duty sidewalk shed as per hpd emergency declaration. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Filing herewith plumbing demolition inside the garage/parking structure to make way for new theater building/structure as per plans. No change in use, occupancy, or egress under this application.
Ansonia endoscopy asc reno - mechanical modifications as per plans filed herewith. no change in use, egress, or occupations.
installation of new mechanical piping, and all accessories related to the new gas fired hot water heaters. installation of new condensate pumps for existing heating system as per plans.