Building Permits in ZIP 10022
Manhattan, NY — 1,628 permits filed recently
1,628 permits
Interior fit out of a portion of a multi tenant floor as shown on drawings. No change in use, egress or occupancy.
Sprinkler modifications as per plans filed herewith. No change to use, egress or occupancy.
Modification to existing sprinkler system and related piping as shown on drawings. no change to use, egress or occupanyc.
Modification to existing HVAC system as per plans filed herewith. no change in use, egress or occupancy under this application
General plumbing work is filed to conjunct with general renovation of a existing store in a mix-used building as per plan. no change in use, egress or occupancy
Installation of pipe scaffolding as per plans. pipe scaffold shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Interior renovation to existing office space. includes theinstallation and selective demolition of non load bearingpartitions and related finishes. no change in use oroccupancy.
Filing for interior renovation for apartment 3C. Scope to includes demo and retro-fit of the bathroom, and kitchen, installation of new appliances, skim coating and painting all walls, laying new floo...
Filing herewith drawings indicating modification of the Sprinkler System on the 35th floor construction (marketed as the 36th floor). No change in use, egress, or occupancy under this application.
General construction to renovate apt 27b on the 26th floor. work will include new partitions & finishes, and new plumbing fixtures. no change in use, egress, or occupancy under this filing.
Interior renovation to include demolition of existing and construction of new partitions in suite 500 for existing office space. no change in use, egress, or occupancy.
plumbing work as shown on plans filed herewith. No change in use, egress or occupancy.
Plumbing work as shown on plans filed herewith. No change in use, egress or occupancy.
Filing herewith drawings indicating modification of the Mechanical system on the 35th floor construction (marketed as the 36th floor). No change in use, egress, or occupancy under this application.
Plumbing work for Tokio HCC on 23rd marketing floor (22nd construction)
Mechanical modifications taking place on 13th (12a marketing) and 14th floors as per drawings filed herewith. no change in use, egress or occupancy.
Filing for plumbing work associated with interior demo of 2nd, 4th, 13th, 22nd, and 23rd floors as per plans submitted herewith.
Application filed for the combination of units 34 efg. this application is filed to comply with tppn 3 of 97. no change of co required.
Underpinning work as per plans filed. Filed in conjunction with NB #121206569.
Filing herewith drawings indicating modification of the Sprinkler System on the 35th floor construction (marketed as the 36th floor). No change in use, egress, or occupancy under this application.