Building Permits in ZIP 10022
Manhattan, NY — 1,628 permits filed recently
1,628 permits
Hereby filing for the renovation of unit 14b. no change in use, egress or occupancy.
Application filed herewith for a temporary construction office. no change in occupancy use or egress under this application.
Interior renovation of an existing apartment on Nineteenth floor per plans (Unit 19-B) . No change in use, occupancy and egress is proposed under this application.
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Demolition and general construction work on 15th and 16th floors as per plans. No change to use, egress or occupancy.
Filing herewith drawings indicating modification of the Sprinkler System on the 7th floor. No change in use, egress, or occupancy under this application.
Install new 2 wc, 2 lavs, 2 hwh non gas, 2 sinks, 1 dishwasher, 1 funnel drain, 1 water piping & 1 sanitary piping.
Renovation of 2-bedroom, 3 bath apartment including non-structural partition demolition, new partition work, 3 renovated and 1 new bathroom, kitchen, laundry rm. No change to use, egress or ocupancy.
Hereby filing for the renovation of unit 14b. no change in use, egress or occupancy.
Filing herewith drawings indicating modification of the Sprinkler System on the 7th floor. No change in use, egress, or occupancy under this application.
Preparation Work for Full Demolition - Equipment Use for Interior Demo
Renovation of 2-bedroom, 3 bath apartment including non-structural partition demolition, new partition work, 3 renovated and 1 new bathroom, kitchen, laundry rm. No change to use, egress or ocupancy.
Interior renovation of an existing apartment on Nineteenth floor per plans (Unit 19-B) . No change in use, occupancy and egress is proposed under this application.
Demolition and general construction work on 15th and 16th floors as per plans. No change to use, egress or occupancy.
Application filed herewith for a temporary construction office. no change in occupancy use or egress under this application.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Nicholas Kagios, Special Rigger # 7720:
Preparation Work for Full Demolition - Equipment Use for Interior Demo
Install new 2 wc, 2 lavs, 2 hwh non gas, 2 sinks, 1 dishwasher, 1 funnel drain, 1 water piping & 1 sanitary piping.