Building Permits in ZIP 10022
Manhattan, NY — 1,628 permits filed recently
1,628 permits
Modification/addition to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
Architectural modifications taking place on the 5th floor as per plans filed herewith. No change in use, egress or occupancy.
Renovation of existing dining area with new plumbing fixtures on the 2nd floor. no change to use, egress or occupancy.
Modification/addition to existing standpipe system as shown on drawings. No change in use, egress or occupancy.
Structural work filed in conjunction with renovation of existing hotel; addition of cellar mez level.
Restoration at existing church including: new framing for future mechanical equipment new steel reinforcements of existing deteriorated spandrel beams and columns. no change to use egress or occupancy...
Interior renovation of apt. #31c. no change of use, egress or occupancy.
Mh work filed in conjunction with dob now gc and pl. no change to use, occupancy or egress.
Architectural modifications taking place on the 5th floor as per plans filed herewith. No change in use, egress or occupancy.
Mechanical work related to the interior renovation of apartment 7a on the 7th floor. no change to use, egress, or occupancy.
General construction modifications on the 14th (construction) 15th (marketing) floor per plans. no change in use, egress, or occupancy.
Modification/addition to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
Mechanical systems modifications on the 14th (construction) 15th (marketing) floor per plans. no change in use, egress, or occupancy.
Removal of sprinker system and conversion of standpipe system to dry pressurized system in assoasition with full building demolition, by others. there is no change to use, egress, or occupancy.
Application filed for facade repairs. Garage fireproofing repairs. No change to use, occupancy or egress..
Interior renovation to include demolition of existing and construction of new partitions for existing office space. no change in use, egress, or occupancy.
Removal of sprinker system and conversion of standpipe system to dry pressurized system in assoasition with full building demolition, by others. there is no change to use, egress, or occupancy.
Facade Restoration & inspection - Added Scaffolds at New Locations
Preparation Work for Full Demolition - Equipment Use for Interior Demo
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 53rd floor (unit 53c) as per plans filed herewith. no change in use, egress, or occupancy