Building Permits in ZIP 10022
Manhattan, NY — 1,628 permits filed recently
1,628 permits
Removal and installation of interior partitions and doors on floors 4-6 as per plans submitted herewith. No change of use, occupancy or egress under this application.
1.interior renovation of first floor and cellar level of existing retail space. modification of existing sprinkler system work to include the relocation of existing heads, cap non-required heads and i...
Install new sprinkler heads and related piping as shown on drawings. No change in use, egress or occupancy.
mechanical work as shown on plans filed herewith. No change in use egress or occupancy.
Concrete repair work at sub-cellar, cellar, first, and second floor as per plans. No change in use egress or occupancy.
Removal and installation of interior partitions and doors on floors 4-6 as per plans submitted herewith. No change of use, occupancy or egress under this application.
Reinforcement of existing structural steel members and connections as part of 9th Cycle Facade Repair program. No change to use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
1.interior renovation of first floor and cellar level of existing retail space. modification of existing sprinkler system work to include the relocation of existing heads, cap non-required heads and i...
Filing for mechanical work associated with interior renovation of 11th and 12th floor peerless clothing office as per plans submitted herewith.
Renovation of existing office space 1902 & 1903. install partitions, wall and floor finishes. no change of use, egress, or occupancy.
Removal of sprinker system and conversion of standpipe system to pressurized dry system in assoasition with full building demolition, by others. there is no change to use, egress, or occupancy.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Filing for limited exterior repairs. No change to egress, use, or occupancy.
Preparation Work for Full Demolition - Removal of Rooftop Equipment
Sprinkler work for Common Fund on 22nd marketing floor (21st construction)
Removal of sprinker system and conversion of standpipe system to pressurized dry system in assoasition with full building demolition, by others. there is no change to use, egress, or occupancy.
Structural work to remove existing reinforcing steel from 23rd marketing floor (22nd Construction floor) for Common Fund space.
Filing for interior renovation of 11th & 12th floor peerless clothing office space as per plans submitted herewith.
Filed herewith to renovate unit 3e as per plans, no change to use egress or occupancy.