Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy. the sidewalk shed at east 54th street, entrance of east 54th st,3rd avenue, and east 53rd street e...
Filed herewith installation of new sprinkler heads and replacement and relocation exisiting heads as per drawing submitted herewith. No change of use, occupancy or egress under this application.
Modifications to the existing Sprinkler and Plumbing systems on the 5th and 7th floor as per plans submitted herewith. No Change to the Use, Occupancy or Egress.
Mechanical changes as indicated on plans.
Installation of suspended scaffold for facade work or inspection
Facade repairs as per plans filed herewith. No change in use, egress or occupancy.
Application filed for plumbing and sprinkler work on the 14th floor as per pans filed herewith. no change in use, egress, or occupancy.
Sprinkler work on 3rd floor as per plans. No change to use, egress or occupancy.
Plumbing work
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress,or occupancy. the sidewalk shed at madison avenue and east 57th street elevations.
Replace ext'g kitchen and bathroom. install new laundry in ext'g closet and new lighting throughout. plumbing work filed subsequently. no change to use, egress or occupancy.
General refurbishment and minor alterations to select guestrooms
Propose to perform plumbing and sprinkler work. No change in use, egress or occupancy.
Installation and use of temporary knuckleboom as per plans filed herewith. no change in use egress, or occupancy.
Proposed facade and dunnage steel repairs and installation of shoring as indicated on plans submitted herewith. there is no change in use, egress or occupancy.
Work to include new partitions, acousticceilings, materials, fixtures, finishes & equipmentthroughout. work on 17th floor interiors only. no work will be done on egress components or elevators.
INTERIOR RENOVATION, NEW WALLS, NEW FLOORS, NEW KITCHEN & BATH , ON 3rd FLOOR APARTMENT 3B and 4TH FLOOR APT 4C
Installation of suspended scaffold for facade work or inspection.
Installation of temporary roof protection over adjacent properties as per plans. roof protection shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this applic...
Mechanical work from the 32nd to the 34th floor as plans filed herewith. no change in use, egress, or occupancy.